Emp ID
:
1018
Name
:
Mr.Pongthep Wangkahat
:
นายพงษ์เทพ วังคะฮาต
Position
:
Assistant Manager
Section
:
1st Business
 
No.
Date/Time Stamp
Status
Description
Place
Time to back
1
2019-06-18    09 : 42

Deficiency Clearance After PAT Chonburi ,Prachinburi , Sakaeo
18.00
2
2019-06-18    07 : 14
- -
-
3
2019-06-17    08 : 06
- -
-
4
2019-06-17    17 : 30

- -
-
5
2019-06-14    11 : 21

Inspector True Approve final B Chachoengsao,Chonburi, PCR
19.00
6
2019-06-14    07 : 39
- -
-
7
2019-06-13    00 : 00

PAT TRUE MOVE 4G (จันทบุรี , ตราด)
-
8
2019-06-12    07 : 18
- -
-
9
2019-06-12    17 : 30

- -
-
10
2019-06-11    00 : 00

PAT TRUE MOVE 4G ( ปราจีนบุรี , สระแก้ว)
-
11
2019-06-10    12 : 25

Inspector True Approve final B Chachoengsao , Nakhonnayok
17.00
12
2019-06-10    07 : 32
- -
-
13
2019-06-07    07 : 36

PAT route true move 4g mobile Pathum thani(PTT),Rangsit(RST)
17.00
14
2019-06-07    07 : 32
- -
-
15
2019-06-06    08 : 36

PAT route true move 4g mobile BMA.3 (Bangkok)
17.00
16
2019-06-06    07 : 33
- -
-
17
2019-06-05    11 : 24

Route Survey Befor PAT 4g true Chachoengsao /// Prachinburi
17.00
18
2019-06-05    07 : 34
- -
-
19
2019-06-04    07 : 32
- -
-
20
2019-06-04    17 : 30

- -
-
21
2019-05-31    11 : 51

Deficiency Clearance After PAT Rayong (RYG) , Chonburi (CBR)
18.00
22
2019-05-31    07 : 25
- -
-
23
2019-05-30    00 : 00

PAT TRUE MOVE 4G (ชลบุรี , ระยอง)
-
24
2019-05-29    08 : 53

PAT route true move 4g mobile Chachoengsao ,Chonburi
18.00
25
2019-05-29    08 : 53

PAT route true move 4g mobile Chachoengsao ,Chonburi
18.00
26
2019-05-29    08 : 52
- -
-
27
2019-05-29    07 : 12
- -
-
28
2019-05-28    07 : 38
- -
-
29
2019-05-28    17 : 30

- -
-
30
2019-05-27    12 : 49

Submit Final Before Pat&Survey Pathum thani (PTT)
17.00
31
2019-05-27    07 : 24
- -
-
32
2019-05-24    08 : 27

Route Survey Befor PAT 4g true Ratchaburi (RCB)
19.00
33
2019-05-24    07 : 13
- -
-
34
2019-05-23    10 : 40

PAT & Deficieney Clearance Prachinburi , Chachoengsao
19.00
35
2019-05-23    07 : 46
- -
-
36
2019-05-22    07 : 38
- -
-
37
2019-05-22    17 : 30

- -
-
38
2019-05-21    10 : 09

Final BOQ&Survey Before PAT BMA.5(Bangkok) /// Chonburi
18.00
39
2019-05-21    07 : 28
- -
-
40
2019-05-15    08 : 09
- -
-
41
2019-05-15    17 : 30

- -
-
42
2019-05-14    10 : 28

Deficiency Clearance After PAT Chachoengsao , Chonburi
17.00
43
2019-05-14    08 : 01
- -
-
44
2019-05-13    07 : 45

PAT UPC.5 Area CCS//CBR 4G Chachoengsao ,Chonburi
19.00
45
2019-05-13    07 : 23
- -
-
46
2019-05-10    11 : 14

Route Survey Befor PAT true 4g Chachoengsao ,Chonburi
17.00
47
2019-05-10    07 : 31
- -
-
48
2019-05-09    09 : 59

PAT Route True move 4G Mobile Chachoengsao , Nakhonnayok
19.00
49
2019-05-09    07 : 43
- -
-
50
2019-05-08    10 : 01

Route Survey Before PAT(true) Chachoengsao ,Chonburi
18.00
51
2019-05-08    07 : 35
- -
-
52
2019-05-07    08 : 41

PAT Work Route True move 4G BKF (Bangkok)
17.00
53
2019-05-07    06 : 39
- -
-
54
2019-05-03    07 : 30
- -
-
55
2019-05-03    17 : 30

- -
-
56
2019-05-02    09 : 59

Inspector Final BOQ After PAT Chachoengsao (CCS)
17.00
57
2019-05-02    07 : 25
- -
-
58
2019-04-30    07 : 06
- -
-
59
2019-04-30    17 : 30

- -
-
60
2019-04-29    13 : 07

Submit Fiber BOQ Befort PAT/Su Area BMA.3 (BKF) Bangkok
17.00
61
2019-04-29    07 : 26
- -
-
62
2019-04-26    07 : 39
- -
-
63
2019-04-26    17 : 30

- -
-
64
2019-04-25    07 : 39

Deficiency Clearance After PAT Rayong (RYG),Chachoengsao(CCS)
18.00
65
2019-04-25    07 : 12
- -
-
66
2019-04-24    11 : 03

Inspector Final BOQ After PAT Chachoengsao (CCS),Chonburi(CB
18.00
67
2019-04-24    07 : 46
- -
-
68
2019-04-23    00 : 00

PAT TRUE MOVE 4G (ชลบุรี , ระยอง)
-
69
2019-04-22    07 : 28
- -
-
70
2019-04-22    17 : 30

- -
-
71
2019-04-19    10 : 45

Recheck Deficiency After PAT Chachoengsao // Prachinburi
18.00
72
2019-04-19    07 : 15
- -
-
73
2019-04-18    12 : 03

Route Survey Befor PAT (TRUE) Chachoengsao ,Prachinburi
18.00
74
2019-04-18    08 : 12
- -
-
75
2019-04-12    07 : 09

PAT Work Route True move 4G Rayong (RYG) , Chonburi (CBR)
19.00
76
2019-04-12    06 : 59
- -
-
77
2019-04-11    07 : 29

PAT Work Route True move 4G Chachoengsao (CCS),Chonburi(CB
19.00
78
2019-04-11    07 : 03
- -
-
79
2019-04-10    07 : 16
- -
-
80
2019-04-10    17 : 30

- -
-
81
2019-04-03    07 : 55

PAT Work Route True move 4G Chachoengsao , Nakhonnayok
19.00
82
2019-04-03    06 : 46
- -
-
83
2019-04-02    00 : 00

PAT TRUE MOVE 4G (จันทบุรี , ตราด)
-
84
2019-04-01    00 : 00

PAT TRUE MOVE 4G ( ปราจีนบุรี , สระแก้ว)
-
85
2019-03-29    09 : 13

PAT Work Route True move 4G Chachoengsao (CCS),Chonburi(CB
19.00
86
2019-03-29    07 : 10
- -
-
87
2019-03-27    14 : 01

Inspector Final BOQ After PAT Chachoengsao , Nakhonnayok
18.00
88
2019-03-27    07 : 58
- -
-
89
2019-03-26    07 : 41
- -
-
90
2019-03-26    17 : 30

- -
-
91
2019-03-25    07 : 45
- -
-
92
2019-03-25    17 : 30

- -
-
93
2019-03-22    07 : 23
- -
-
94
2019-03-22    17 : 30

- -
-
95
2019-03-21    07 : 01

PAT Work Route True move 4G Chanthaburi(BTB),SaKaeo (SKO)
No Return
96
2019-03-21    06 : 58
- -
-
97
2019-03-20    10 : 02

Route Survey Befor PAT (TRUE) Chachoengsao , Prachinburi
17.00
98
2019-03-20    07 : 41
- -
-
99
2019-03-19    00 : 00

PAT TRUE MOVE 4G (ชลบุรี , ระยอง)
-
100
2019-03-18    07 : 34
- -
-
101
2019-03-18    17 : 30

- -
-
102
2019-03-15    07 : 26

PAT Work Route True move 4G Rayong (RYG),Chonburi (CBR)
19.00
103
2019-03-15    07 : 26
- -
-
104
2019-03-14    07 : 38
- -
-
105
2019-03-14    17 : 30

- -
-
106
2019-03-13    09 : 26

PAT Work Route True move 4G Chachoengsao , Nakhonnayok
19.00
107
2019-03-13    07 : 36
- -
-
108
2019-03-12    09 : 38

Route Survey Befor PAT (TRUE) Chonburi(CBR),Rayong(RYG)
18.00
109
2019-03-12    07 : 26
- -
-
110
2019-03-11    00 : 00

PAT TRUE MOVE 4G ( ปราจีนบุรี , สระแก้ว)
-
111
2019-03-11    00 : 00

PAT TRUE MOVE 4G ( ปราจีนบุรี , สระแก้ว)
-
112
2019-03-11    00 : 00

PAT TRUE MOVE 4G ( ปราจีนบุรี , สระแก้ว)
-
113
2019-03-08    07 : 52
- -
-
114
2019-03-08    17 : 30

- -
-
115
2019-03-07    00 : 00

PAT TRUE MOVE 4G (BKF) ฉะเชิงเทรา นครนาย
-
116
2019-03-06    11 : 42

Route Survey Befor PAT (TRUE) Chachoengsao (CCS),Chonburi(CB
18.00
117
2019-03-06    07 : 44
- -
-
118
2019-03-05    00 : 00

PAT TRUE MOVE 4G (ชลบุรี , ระยอง)
-
119
2019-03-05    00 : 00

PAT TRUE MOVE 4G (ชลบุรี , ระยอง)
-
120
2019-03-04    08 : 06

Route PATTrue Move 4G Chachoengsao , Nakhonnayok
19.00
121
2019-03-04    07 : 32
- -
-
122
2019-03-01    07 : 44
- -
-
123
2019-03-01    17 : 30

- -
-
124
2019-02-28    00 : 00

PAT TRUE MOVE 4G (จันทบุรี , ตราด)
-
125
2019-02-27    12 : 22

PAT Work Route True move 4G Chanthaburi(BTB) ,Trat (TRT)
No Return
126
2019-02-27    07 : 39
- -
-
127
2019-02-26    00 : 00

PAT TRUE MOVE 4G (จันทบุรี , ตราด)
-
128
2019-02-25    00 : 00

PAT TRUE MOVE 4G ( ปราจีนบุรี , สระแก้ว)
-
129
2019-02-22    12 : 54

Route Survey Befor PAT (TRUE) Chachoengsao , Nakhonnayok
18.00
130
2019-02-22    07 : 28
- -
-
131
2019-02-21    08 : 45

PAT Work Route True move 4G Chachoengsao , Nakhonnayok
18.00
132
2019-02-21    07 : 46
- -
-
133
2019-02-20    08 : 02

PAT Work Route True move 4G Chonburi(CBR),Rayong(RYG)
19.00
134
2019-02-20    06 : 48
- -
-
135
2019-02-18    09 : 21

PAT Work Route TRUE MOVE 4G Chonburi (CBR)
18.00
136
2019-02-18    07 : 25
- -
-
137
2019-02-15    12 : 18

Route Survey Befor PAT (TRUE) Chachoengsao (CCS),Chonburi(CB
19.00
138
2019-02-15    07 : 32
- -
-
139
2019-02-14    07 : 27
- -
-
140
2019-02-14    17 : 30

- -
-
141
2019-02-13    00 : 00

PAT TRUE MOVE 4G ( ปราจีนบุรี , สระแก้ว)
-
142
2019-02-12    00 : 00

PAT TRUE MOVE 4G ( ปราจีนบุรี , สระแก้ว)
-
143
2019-02-11    07 : 41
- -
-
144
2019-02-11    17 : 30

- -
-
145
2019-02-08    00 : 00

PAT TRUE MOVE 4G (จันทบุรี , ตราด)
-
146
2019-02-07    00 : 00

PAT TRUE MOVE 4G ( ปราจีนบุรี , สระแก้ว)
-
147
2019-02-06    08 : 19

Route Survey Befor PAT (TRUE) Prachinburi (PCR,Sakaeo(SKO)
19.00
148
2019-02-06    07 : 07
- -
-
149
2019-02-05    07 : 51
- -
-
150
2019-02-05    17 : 30

- -
-
151
2019-02-04    06 : 47

PAT 4G TRUE MOVE Rayong (RYG) , Chonburi (CBR)
19.00
152
2019-02-04    06 : 37
- -
-
153
2019-02-01    12 : 26

Route Survey Befor PAT true 4g Chachoengsao (CCS),Chonburi(CB
18.00
154
2019-02-01    07 : 56
- -
-
155
2019-01-31    10 : 29

Route Survey Befor PAT (TRUE) Prachinburi (PCR) , Sakaeo(SKO
19.00
156
2019-01-31    07 : 44
- -
-
157
2019-01-30    07 : 51

PAT Work Coverage / Capacity Chachoengsao , Prachinburi
18.00
158
2019-01-30    07 : 45
- -
-
159
2019-01-29    10 : 40

Route Survey Before PAT true 4 Chachoengsao , Prachinburi
18.00
160
2019-01-29    07 : 59
- -
-
161
2019-01-28    07 : 51
- -
-
162
2019-01-28    17 : 30

- -
-
163
2019-01-25    07 : 55
- -
-
164
2019-01-25    17 : 30

- -
-
165
2019-01-24    00 : 00

PAT work Coverage / Capacity
-
166
2019-01-23    00 : 00

PAT work Coverage / Capacity
-
167
2019-01-22    09 : 46

PAT Work Coverage / Capacity PCR , SKO , CTB , TRT
No Return
168
2019-01-22    08 : 12
- -
-
169
2019-01-21    08 : 25
- -
-
170
2019-01-21    17 : 30

- -
-
171
2019-01-18    00 : 00

Route Survey Before PAT TRUE)
-
172
2019-01-17    00 : 00

Route Survey Before PAT TRUE)
-
173
2019-01-16    00 : 00

Route Survey Before PAT TRUE)
-
174
2019-01-16    00 : 00

Route Survey Before PAT TRUE)
-
175
2019-01-15    00 : 00

Route Survey Before PAT TRUE)
-
176
2019-01-14    00 : 00

Route Survey Before PAT TRUE)
-
177
2019-01-13    00 : 00

Route Survey Before PAT TRUE)
-
178
2019-01-12    00 : 00

Route Survey Before PAT TRUE)
-
179
2019-01-11    00 : 00

Route Survey Before PAT TRUE)
-
180
2019-01-10    00 : 00

Route Survey Before PAT TRUE)
-
181
2019-01-09    06 : 39

Route Survey Befor PAT (TRUE) Nongkhai , Loei , UdonThani,
No Return
182
2019-01-09    06 : 38
- -
-
183
2019-01-08    08 : 14
- -
-
184
2019-01-08    17 : 30

- -
-
185
2019-01-07    12 : 22

Inspector Final BOQ After PAT Chachoengsao (CCS),Chonburi(CB
17.00
186
2019-01-07    08 : 05
- -
-
187
2019-01-04    07 : 45
- -
-
188
2019-01-04    17 : 30

- -
-
189
2019-01-03    07 : 50
- -
-
190
2019-01-03    17 : 30

- -
-
191
2019-01-02    08 : 01
- -
-
192
2019-01-02    17 : 30

- -
-
193
2018-12-27    07 : 43
- -
-
194
2018-12-27    17 : 30

- -
-
195
2018-12-26    10 : 11

Inspector Final BOQ After PAT Chachoengsao (CCS),Chonburi(CB
15.00
196
2018-12-26    07 : 40
- -
-
197
2018-12-25    07 : 54

True Inspector Addrove Final Chanthaburi(BTB),Trat(TRT),RYG
No Return
198
2018-12-25    07 : 26
- -
-
199
2018-12-24    09 : 25

Inspector Final BOQ After PAT FTTx Project Chonburi (CBR)
18.00
200
2018-12-24    07 : 29
- -
-
201
2018-12-21    08 : 13
- -
-
202
2018-12-21    17 : 30

- -
-
203
2018-12-20    00 : 00

Training ODN PAT BMA.1 Office TRUE
-
204
2018-12-19    09 : 34

Route Survey New site (TRUE) Chachoengsao , Nakhonnayok
18.00
205
2018-12-19    07 : 34
- -
-
206
2018-12-18    09 : 17

Route Survey Before PAT(TRUE) Chachoengsao (CCS),Chonburi(CB
18.00
207
2018-12-18    07 : 52
- -
-
208
2018-12-17    12 : 58

Route Survey Before PAT TRUE) Chachoengsao (CCS)
18.00
209
2018-12-17    07 : 33
- -
-
210
2018-12-14    06 : 00

Assistant Manager Meeting Shangri-La Hotel
13.00
211
2018-12-14    05 : 57
- -
-
212
2018-12-13    00 : 00

Check test core fiber link 4g SKO,CTB
-
213
2018-12-12    09 : 37

Close Loop Split Ring TRUE4g Sakaeo(SKO),Chanthaburii(CTB)
No Return
214
2018-12-12    07 : 39
- -
-
215
2018-12-11    09 : 31

Check test Close loop Ring 4g Chachoengsao(CCS),Chonburi(CB
19.00
216
2018-12-11    07 : 48
- -
-
217
2018-12-07    08 : 40

Check test Close loop Ring 4g Sakaeo(SKO),Chanthaburii(CTB)
19.00
218
2018-12-07    07 : 39
- -
-
219
2018-12-06    07 : 57

PAT Work Coverage / Capacity Area Rayong (RYG)
19.00
220
2018-12-06    07 : 41
- -
-
221
2018-12-04    10 : 17

Check test Close loop Ring 4g Chachoengsao (CCS),Chonburi(CB
19.00
222
2018-12-04    07 : 42
- -
-
223
2018-12-03    08 : 55

Check test Close loop Ring 4g Prachinburi (PCR) , Sakaeo(SKO
No Return
224
2018-12-03    06 : 59
- -
-
225
2018-11-30    10 : 11

Check test Close loop Ring 4g Chachoengsao (CCS),Chonburi(CB
19.00
226
2018-11-30    07 : 52
- -
-
227
2018-11-29    09 : 50

Route Survey Before PAT true 4 Chachoengsao(CCS)
18.00
228
2018-11-29    08 : 03
- -
-
229
2018-11-28    07 : 09

PAT Work Coverage / Capacity Chonburi(CBR) , Rayong(RYG)
19.00
230
2018-11-28    07 : 04
- -
-
231
2018-11-27    07 : 40

PAT work Coverage / Capacity Rayong (RYG) , Chonburi (CBR)
19.00
232
2018-11-27    07 : 37
- -
-
233
2018-11-26    12 : 20

Route Survey Befor PAT (TRUE) Chachoengsao (CCS),Chonburi(CB
18.00
234
2018-11-26    07 : 38
- -
-
235
2018-11-21    07 : 16

PAT work Coverage / Capacity Prachinburi (PCR),Sakaeo(SKO)
No Return
236
2018-11-21    07 : 15
- -
-
237
2018-11-20    07 : 45
- -
-
238
2018-11-20    17 : 30

- -
-
239
2018-11-19    11 : 11

Route Survey Befor PAT (TRUE) Chachoengsao (CCS),Chonburi(CB
18.00
240
2018-11-19    07 : 32
- -
-
241
2018-11-16    00 : 00

PAT TRUE MOVE 4G (ชลบุรี , ระยอง)
-
242
2018-11-15    09 : 22

Check test Rink Core Fiber 4g Sakaeo(SKO),Prachinburi(PCR)
No Return
243
2018-11-15    07 : 30
- -
-
244
2018-11-14    10 : 13

Inspector Recheck Deficiency Chonburi(CB
18.00
245
2018-11-14    07 : 30
- -
-
246
2018-11-13    07 : 30

PAT Working (TRUE 4g) Chonburi(CBR) , Rayong(RYG)
18.00
247
2018-11-13    07 : 22
- -
-
248
2018-11-12    06 : 41

PAT work Coverage / Capacity Rayong (RYG),Chonburi (CBR)
19.00
249
2018-11-12    06 : 40
- -
-
250
2018-11-09    08 : 17
- -
-
251
2018-11-09    17 : 30

- -
-
252
2018-11-08    00 : 00

PAT TRUE MOVE 4G (ชลบุรี , ระยอง)
-
253
2018-11-07    10 : 17

Route Survey Befor PAT (TRUE) Chonburi(CBR) , Rayong(RYG)
18.00
254
2018-11-07    08 : 00
- -
-
255
2018-11-06    00 : 00

PAT TRUE MOVE 4G (จันทบุรี , ตราด)
-
256
2018-11-05    09 : 15

Route Survey New Site (TRUE4) Bangkok (BKA),Nonthaburi (NTB)
18.00
257
2018-11-05    07 : 53
- -
-
258
2018-11-02    11 : 49

Inspector Final BOQ After PAT Chachoengsao (CCS),Chonburi(CB
18.00
259
2018-11-02    07 : 22
- -
-
260
2018-11-01    10 : 37

Survey Site Before PAT (ture) Chachoengsao (CCS),Chonburi(CB
18.00
261
2018-11-01    07 : 48
- -
-
262
2018-10-31    11 : 20

Route Survey New Site (TRUE) Area Prachinburi (PCR)
18.00
263
2018-10-31    07 : 33
- -
-
264
2018-10-30    08 : 54

Survey Route Befor PAT (true) Prachinburi (PCR) , Sakaeo(SKO
19.00
265
2018-10-30    07 : 21
- -
-
266
2018-10-29    09 : 57

Route Survey Befor PAT (TRUE) Rayong (RYG) , Chonburi (CBR)
19.00
267
2018-10-29    07 : 24
- -
-
268
2018-10-26    10 : 50

Inspector Final BOQ After PAT Chachoengsao (CCS),Chonburi(CB
18.00
269
2018-10-26    08 : 26
- -
-
270
2018-10-25    00 : 00

PAT TRUE MOVE 4G (จันทบุรี , ตราด)
-
271
2018-10-24    00 : 00

PAT TRUE MOVE 4G (จันทบุรี , ตราด)
-
272
2018-10-23    00 : 00

Survey Route Befor PAT จันทบุรี , ตราด
-
273
2018-10-22    07 : 22

PAT work Coverage / Capacity Chanthaburi(CTB),Trat(TRT),RYG
No Return
274
2018-10-22    07 : 12
- -
-
275
2018-10-19    07 : 31
- -
-
276
2018-10-19    17 : 30

- -
-
277
2018-10-18    10 : 22

Recheck Deficiency After PAT Chachoengsao(CCS),Chonburi(CB
18.00
278
2018-10-18    07 : 54
- -
-
279
2018-10-17    06 : 38

PAT work Coverage / Capacity Chonburi(CBR) , Rayong(RYG)
19.00
280
2018-10-17    06 : 38
- -
-
281
2018-10-16    07 : 51
- -
-
282
2018-10-16    17 : 30

- -
-
283
2018-10-12    09 : 45

PAT work Coverage / Capacity Chachoengsao (CCS),Chonburi(CB
No Return
284
2018-10-12    07 : 35
- -
-
285
2018-10-11    06 : 15

Training PEA Bangkok
18.00
286
2018-10-11    06 : 15
- -
-
287
2018-10-10    06 : 04

Training PEA Bangkok
18.00
288
2018-10-10    06 : 04
- -
-
289
2018-10-09    10 : 21

PAT work Coverage / Capacity Chachoengsao (CCS),Chonburi(CB
No Return
290
2018-10-09    07 : 38
- -
-
291
2018-10-08    09 : 53

Check test Core Fiber ON Site Chachoengsao (CCS),Chonburi(CB
No Return
292
2018-10-08    07 : 31
- -
-
293
2018-10-05    00 : 00

Check test link Core Fiber 4g
-
294
2018-10-04    06 : 58

New Site SurveyTest Core Fiber Sakaeo(SKO),Prachinburi(PCR)
No Return
295
2018-10-04    06 : 58
- -
-
296
2018-10-03    07 : 32
- -
-
297
2018-10-03    17 : 30

- -
-
298
2018-10-02    09 : 05

Route Survey New Site (TRUE4) Chonburi(CBR) , Rayong(RYG)
No Return
299
2018-10-02    07 : 31
- -
-
300
2018-10-01    08 : 53

Check test Core Fiber ON Site Prachinburi (PCR,Sakaeo(SKO)
No Return
301
2018-10-01    07 : 33
- -
-
302
2018-09-28    09 : 09

Check test link Core Fiber 4g Province Prachinburi (PCR)
No Return
303
2018-09-28    09 : 09

Check test link Core Fiber 4g Province Prachinburi (PCR)
No Return
304
2018-09-28    09 : 09
- -
-
305
2018-09-28    07 : 33
- -
-
306
2018-09-27    09 : 22

Check test link Core Fiber 4g Chonburi(CBR) , Rayong(RYG)
No Return
307
2018-09-27    07 : 56
- -
-
308
2018-09-26    09 : 09

Check test link Core Fiber 4g Chachoengsao (CCS),Chonburi(CB
No Return
309
2018-09-26    07 : 25
- -
-
310
2018-09-25    09 : 07

Check test link Core Fiber 4g Chachoengsao(CCS)
No Return
311
2018-09-25    07 : 27
- -
-
312
2018-09-24    09 : 17

Check test Close loop link 4g Chachoengsao (CCS),Chonburi(CB
No Return
313
2018-09-24    07 : 25
- -
-
314
2018-09-21    07 : 10

PAT work Coverage / Capacity Chonburi(CBR) , Rayong(RYG)
No Return
315
2018-09-21    07 : 05
- -
-
316
2018-09-20    11 : 08

Check test link Core Fiber 4g Chonburi(CBR) , Rayong(RYG)
19.00
317
2018-09-20    07 : 34
- -
-
318
2018-09-19    09 : 26

Check test core fiber link 4g Chachoengsao (CCS),Chonburi(CB
18.00
319
2018-09-19    07 : 20
- -
-
320
2018-09-18    09 : 41

Check test Close loop link 4g Chachoengsao(CCS),Chonburi(CB
19.00
321
2018-09-18    07 : 27
- -
-
322
2018-09-17    09 : 19

Check test Rink Core Fiber 4g Chachoengsao(CCS),Chonburi(CB
19.00
323
2018-09-17    07 : 30
- -
-
324
2018-09-14    09 : 51

Route Survey New Site (TRUE) Chachoengsao (CCS),Chonburi(CB
No Return
325
2018-09-14    07 : 25
- -
-
326
2018-09-13    12 : 05

Route Survey Befor PAT (TRUE) Chachoengsao (CCS),Chonburi(CB
18.00
327
2018-09-13    07 : 16
- -
-
328
2018-09-12    07 : 25
- -
-
329
2018-09-12    17 : 30

- -
-
330
2018-09-11    09 : 13

Check test Close loop link 4g Chachoengsao (CCS),Chonburi(CB
19.00
331
2018-09-11    07 : 21
- -
-
332
2018-09-10    09 : 56

Check test link Core Fiber 4g Chachoengsao (CCS),Chonburi(CB
No Return
333
2018-09-10    07 : 22
- -
-
334
2018-09-07    12 : 21

Route Survey Befor PAT (TRUE) Chachoengsao (CCS),Chonburi(CB
18.00
335
2018-09-07    07 : 22
- -
-
336
2018-09-06    00 : 00

Check test link Core Fiber 4g
-
337
2018-09-05    00 : 00

Check test link Core Fiber 4g
-
338
2018-09-04    10 : 57

Check test close loop link 4g Sakaeo(SKO),Prachinburi(PCR)
No Return
339
2018-09-04    07 : 25
- -
-
340
2018-09-03    10 : 43

Survey New Site (true 4g) Chachoengsao (CCS),Chonburi(CB
17.00
341
2018-09-03    07 : 28
- -
-
342
2018-08-31    09 : 18

Check test close loop link 4g Chachoengsao (CCS),Chonburi(CB
No Return
343
2018-08-31    07 : 20
- -
-
344
2018-08-30    09 : 10

Check test core fiber link 4g Chonburi(CBR) , Rayong(RYG)
No Return
345
2018-08-30    07 : 29
- -
-
346
2018-08-29    08 : 59

Inspector Recheck Deficiency Chachoengsao (CCS),Chonburi(CB
18.00
347
2018-08-29    07 : 16
- -
-
348
2018-08-28    09 : 03

Check test core fiber link 4g Chonburi(CBR) , Rayong(RYG)
19.00
349
2018-08-28    07 : 24
- -
-
350
2018-08-27    09 : 09

Check test link Core Fiber 4g Chonburi(CBR),Chanthaburi(BTB)
21.00
351
2018-08-27    09 : 09
- -
-
352
2018-08-24    08 : 56

Check test link Core Fiber 4g Chachoengsao (CCS),Chonburi(CB
21.33
353
2018-08-24    07 : 11
- -
-
354
2018-08-23    09 : 19

Test Core fiber true 4g Chachoengsao (CCS),Chonburi(CB
18.00
355
2018-08-23    07 : 34
- -
-
356
2018-08-22    07 : 25
- -
-
357
2018-08-22    17 : 30

- -
-
358
2018-08-21    07 : 11

PAT Work (true 4g) Chonburi(CBR) , Rayong(RYG)
19.00
359
2018-08-21    07 : 00
- -
-
360
2018-08-20    09 : 37

PAT (true 4g) & Survey FTTx Chonburi(CBR) , Rayong(RYG)
21.00
361
2018-08-20    07 : 22
- -
-
362
2018-08-17    07 : 11

Route Survey New Site (TRUE4) Area Rayong (RYG)
18.00
363
2018-08-17    07 : 08
- -
-
364
2018-08-16    07 : 32
- -
-
365
2018-08-16    17 : 30

- -
-
366
2018-08-15    08 : 53

Survey FTTx Overlay (true 4g) Province Chonburi (CBR)
18.00
367
2018-08-15    07 : 21
- -
-
368
2018-08-14    07 : 19
- -
-
369
2018-08-14    17 : 30

- -
-
370
2018-08-10    09 : 28

Route Survey FTTx (TRUE4) Chonburi(CBR)
18.00
371
2018-08-10    07 : 26
- -
-
372
2018-08-09    08 : 56

Survey Route Befor PAT (true) Chonburi(CBR),Chanthaburi(BTB)
22.40
373
2018-08-09    07 : 19
- -
-
374
2018-08-08    06 : 51
- -
-
375
2018-08-08    17 : 30

- -
-
376
2018-08-07    07 : 28
- -
-
377
2018-08-07    17 : 30

PAT TRUE MOVE 4G (BKF) Bangkok
18.00
378
2018-08-06    09 : 25

PAT Working (TRUE 4g) Area Prachinburi (PCR)
No Return
379
2018-08-06    07 : 29
- -
-
380
2018-08-03    08 : 27

PAT Working (TRUE 4g) Chachoengsao ,Chonburi
No Return
381
2018-08-03    07 : 25
- -
-
382
2018-08-02    07 : 45
- -
-
383
2018-08-02    17 : 30

- -
-
384
2018-08-01    08 : 08
- -
-
385
2018-08-01    17 : 30

- -
-
386
2018-07-31    10 : 04

Survey Site Before PAT (ture) Chachoengsao , Nakhonnayok
18.00
387
2018-07-31    07 : 21
- -
-
388
2018-07-26    08 : 43

PAT Working (TRUE 4g) Chachoengsao ,Chonburi
No Return
389
2018-07-26    07 : 32
- -
-
390
2018-07-25    08 : 58

Planed PAT Work (TRUE 4g) Chachoengsao (CCS),Chonburi(CB
19.00
391
2018-07-25    07 : 26
- -
-
392
2018-07-24    08 : 57

Route Survey After PAT (TRUE) Chachoengsao (CCS)
17.00
393
2018-07-24    07 : 33
- -
-
394
2018-07-23    08 : 46
- -
-
395
2018-07-23    17 : 30

มีการถ่ายข้อมูลเครื่องทำให้ล้อดอินช้า
-
396
2018-07-20    07 : 43
- -
-
397
2018-07-20    17 : 30

- -
-
398
2018-07-19    07 : 17
- -
-
399
2018-07-19    17 : 30

- -
-
400
2018-07-18    17 : 16
- -
-
401
2018-07-18    17 : 30

เครื่องโน็ตบุ็กตกแตกแจ้งซ่อมและใช้อื่น
-
402
2018-07-17    00 : 00

Route Survey new site TURE 4G PCR,CCS
-
403
2018-07-16    00 : 00

Route Survey new site TURE 4G CCS,
-
404
2018-07-16    00 : 00

Route Survey new site TURE 4G CCS,
-
405
2018-07-13    10 : 01

Route Survey New Site (TRUE4) Area Prachinburi (PCR)
17.00
406
2018-07-13    07 : 30
- -
-
407
2018-07-12    09 : 31

Route Survey New Site (TRUE) Chachoengsao (CCS)
17.00
408
2018-07-12    07 : 26
- -
-
409
2018-07-11    07 : 32
- -
-
410
2018-07-11    17 : 30

- -
-
411
2018-07-10    07 : 44
- -
-
412
2018-07-10    17 : 30

- -
-
413
2018-07-09    08 : 00
- -
-
414
2018-07-09    17 : 30

- -
-
415
2018-07-06    07 : 29
- -
-
416
2018-07-06    17 : 30

- -
-
417
2018-07-05    07 : 53
- -
-
418
2018-07-05    17 : 30

- -
-
419
2018-07-04    07 : 21
- -
-
420
2018-07-04    17 : 30

- -
-
421
2018-07-03    07 : 30
- -
-
422
2018-07-03    17 : 30

- -
-
423
2018-07-02    07 : 32
- -
-
424
2018-07-02    17 : 30

- -
-
425
2018-06-29    07 : 28
- -
-
426
2018-06-29    17 : 30

- -
-
427
2018-06-28    07 : 46
- -
-
428
2018-06-28    17 : 30

- -
-
429
2018-06-27    09 : 06

Fiber Mesh at SCADA System Wellgrow Industrial Estate
15.00
430
2018-06-27    07 : 16
- -
-
431
2018-06-26    09 : 02

Route Survey PEA Fiber Mesh Wellgrow Industrial Estate
15.00
432
2018-06-26    07 : 22
- -
-
433
2018-06-25    07 : 17
- -
-
434
2018-06-25    17 : 30

- -
-
435
2018-06-22    07 : 21
- -
-
436
2018-06-22    17 : 30

- -
-
437
2018-06-21    07 : 35
- -
-
438
2018-06-21    17 : 30

- -
-
439
2018-06-20    07 : 51
- -
-
440
2018-06-20    17 : 30

- -
-
441
2018-06-19    07 : 10
- -
-
442
2018-06-19    17 : 30

- -
-
443
2018-06-18    06 : 51
- -
-
444
2018-06-18    17 : 30

- -
-
445
2018-06-15    07 : 17
- -
-
446
2018-06-15    17 : 30

- -
-
447
2018-06-14    07 : 27
- -
-
448
2018-06-14    17 : 30

- -
-
449
2018-06-13    07 : 25
- -
-
450
2018-06-13    17 : 30

- -
-
451
2018-06-12    07 : 18
- -
-
452
2018-06-12    17 : 30

- -
-
453
2018-06-11    07 : 10
- -
-
454
2018-06-11    17 : 30

- -
-
455
2018-06-08    07 : 12

Fiber Mesh at SCADA System SCADA/DMS PEA Ngam Wong Wan
13.00
456
2018-06-08    06 : 29
- -
-
457
2018-06-07    07 : 44
- -
-
458
2018-06-07    17 : 30

- -
-
459
2018-06-06    07 : 24
- -
-
460
2018-06-06    17 : 30

- -
-
461
2018-06-05    07 : 41
- -
-
462
2018-06-05    17 : 30

- -
-
463
2018-06-04    07 : 29
- -
-
464
2018-06-04    17 : 30

- -
-
465
2018-06-01    06 : 46
- -
-
466
2018-06-01    17 : 30

- -
-
467
2018-05-31    11 : 59

Submission Drawing FiberMesh SCADA/DMSPEA Ngam Wong Wan
15.00
468
2018-05-31    07 : 31
- -
-
469
2018-05-30    07 : 30
- -
-
470
2018-05-30    17 : 30

- -
-
471
2018-05-28    07 : 13
- -
-
472
2018-05-28    17 : 30

- -
-
473
2018-05-25    07 : 21

Fiber Mesh at SCADA System PEA Ngam Wong Wan
13.00
474
2018-05-25    06 : 37
- -
-
475
2018-05-24    07 : 44
- -
-
476
2018-05-24    17 : 30

- -
-
477
2018-05-23    07 : 13
- -
-
478
2018-05-23    17 : 30

- -
-
479
2018-05-22    07 : 14
- -
-
480
2018-05-21    07 : 09
- -
-
481
2018-05-18    07 : 30
- -
-
482
2018-05-17    07 : 29
- -
-
483
2018-05-16    07 : 36
- -
-
484
2018-05-15    07 : 35
- -
-
485
2018-05-14    08 : 18
- -
-
486
2018-05-11    07 : 45
- -
-
487
2018-05-10    07 : 41
- -
-
488
2018-05-09    07 : 41
- -
-
489
2018-05-04    07 : 27
- -
-
490
2018-05-03    07 : 02
- -
-
491
2018-05-02    07 : 19
- -
-
492
2018-04-30    07 : 33
- -
-
493
2018-04-27    07 : 42
- -
-
494
2018-04-26    11 : 14

Fiber Mesh at SCADA System PEA Chon Buri
15.00
495
2018-04-26    07 : 24
- -
-
496
2018-04-25    07 : 31
- -
-
497
2018-04-24    07 : 33
- -
-
498
2018-04-23    07 : 27
- -
-
499
2018-04-20    07 : 28

PEA Chonburi Fiber Mesh
15.00
500
2018-04-20    06 : 29
- -
-
501
2018-04-19    07 : 27
- -
-
502
2018-04-18    08 : 00
- -
-
503
2018-04-12    07 : 27
- -
-
504
2018-04-11    07 : 31
- -
-
505
2018-04-10    03 : 24
- -
-
506
2018-04-10    03 : 22
- -
-
507
2018-04-10    08 : 15
- -
-
508
2018-04-10    08 : 10
- -
-
509
2016-04-19    08 : 23
- -
-
510
2016-04-18    08 : 16
- -
-
511
2016-04-12    11 : 59

Return Key Open at in Site AWN Area Ayutthaya & Lopburi
17.00
512
2016-04-12    07 : 52
- -
-
513
2016-04-11    10 : 05

Return Key Open at in Site Awn Zone Ayutthaya Lopburi
15.00
514
2016-04-11    07 : 48
- -
-
515
2016-04-08    06 : 05

AAM & Photo in Site&Permission AWN Zone Ayutthaya & Lopburi
No Return
516
2016-04-07    07 : 51
- -
-
517
2016-04-05    10 : 15

AMM Check by Inspector Signatu AWN Area Ayutthaya & Lopburi
No Return
518
2016-04-05    07 : 36
- -
-
519
2016-04-04    07 : 10

Permission PEA & AAM Final boq AWN Ayutthaya & PEA Lopburi
17.00
520
2016-04-01    07 : 45
- -
-
521
2016-03-31    07 : 50
- -
-
522
2016-03-30    06 : 32

Photo & Labeling Add Final BOQ AWN Area Ayutthaya & Lopburi
18.00
523
2016-03-29    07 : 55
- -
-
524
2016-03-28    11 : 35

Photo & Labeling Add Final BOQ AIS Zone Ayutthaya & Lopburi
No Return
525
2016-03-28    07 : 41
- -
-
526
2016-03-25    07 : 35
- -
-
527
2016-03-24    08 : 03

Recheck Labeling in Site Final AWN Area Ayutthaya & Lopburi
18.00
528
2016-03-24    07 : 55
- -
-
529
2016-03-23    07 : 52
- -
-
530
2016-03-22    08 : 33

Photo & Labeling in Site at Fi AWN Zone Ayutthaya & Lopburi
18.00
531
2016-03-22    07 : 31
- -
-
532
2016-03-21    09 : 57

Photo Out Site modify Labeling AWN Zone Ayutthaya & Lopburi
No Return
533
2016-03-21    07 : 47
- -
-
534
2016-03-18    07 : 51
- -
-
535
2016-03-17    06 : 05

Photo & Labeling in Site at Fi AWN Zone Lopburi & Saraburi
18.00
536
2016-03-16    12 : 33

Photo & Labeling in Site AIS Zone Lopburi , Saraburi
No Return
537
2016-03-16    07 : 47
- -
-
538
2016-03-15    07 : 55
- -
-
539
2016-03-14    07 : 58
- -
-
540
2016-03-11    11 : 29

Return Key Open at in Site AWN Zone Ayutthaya & Lopburi
18.00
541
2016-03-11    07 : 33
- -
-
542
2016-03-10    06 : 39

Permission PEA & AAM Final boq AWN Ayutthaya & PEA Lopburi
17.00
543
2016-03-09    07 : 49
- -
-
544
2016-03-08    11 : 58

Submit Final & Permission PEA PEA & AWN Lopburi
18.00
545
2016-03-08    07 : 33
- -
-
546
2016-03-07    12 : 03

Inspector Check & Photo Tie in AWN Zone Lopburi , Saraburi
No Return
547
2016-03-07    07 : 57
- -
-
548
2016-03-04    06 : 58
- -
-
549
2016-03-03    07 : 37
- -
-
550
2016-03-02    10 : 05

Photo Tie cable in Site & AMM AWN Zone Ayutthaya & Lopburi
17.00
551
2016-03-02    07 : 42
- -
-
552
2016-03-01    06 : 22

Photo & Labeling in Site at P/ AWN Zone Lopburi & Saraburi
No Return
553
2016-02-29    07 : 48
- -
-
554
2016-02-26    09 : 35

AAM Submit & Photo in Site AWN Zone Ayutthaya & Lopburi
18.00
555
2016-02-26    07 : 59
- -
-
556
2016-02-26    07 : 57
- -
-
557
2016-02-25    06 : 58

Photo & Labeling in Site AIS Zone Lopburi , Saraburi
No Return
558
2016-02-24    07 : 55
- -
-
559
2016-02-23    07 : 34
- -
-
560
2016-02-19    07 : 29
- -
-
561
2016-02-18    09 : 42

AMM Check by Inspector Signatu AIS Zone Ayutthaya & Lopburi
18.00
562
2016-02-18    07 : 38
- -
-
563
2016-02-17    07 : 36
- -
-
564
2016-02-16    06 : 48

Permission PEA & Final BOQ AIS Zone Ayutthaya & Lopburi
16.00
565
2016-02-15    09 : 48

Permission PEA .2 & Final BOQ Zone AyA , LRI
17.00
566
2016-02-15    07 : 39
- -
-
567
2016-02-12    07 : 42
- -
-
568
2016-02-11    07 : 43
- -
-
569
2016-02-10    11 : 34

Submit Final add p/o &photo in AIS Zone Ayutthaya
17.00
570
2016-02-10    07 : 51
- -
-
571
2016-02-10    07 : 51
- -
-
572
2016-02-09    07 : 28
- -
-
573
2016-02-08    07 : 47
- -
-
574
2016-02-05    07 : 51
- -
-
575
2016-02-01    07 : 57
- -
-
576
2016-01-29    07 : 48
- -
-
577
2016-01-28    06 : 56

Submit Final & Permission PEA AIS Zone Ayutthaya & Lopburi
16.00
578
2016-01-27    07 : 59

Photo & Labeling in Site AIS Ayutthaya & Lopburi
17.00
579
2016-01-27    07 : 48
- -
-
580
2016-01-26    06 : 48

Photo in Site at Final BOQ Add AIS Zone Ayutthaya & Lopburi
16.00
581
2016-01-25    07 : 48
- -
-
582
2016-01-21    07 : 42
- -
-
583
2016-01-20    07 : 16
- -
-
584
2016-01-19    06 : 39

Photo in Site at Final BOQ Add AIS Zone Ayutthaya & Lopburi
17.00
585
2016-01-18    07 : 37
- -
-
586
2016-01-15    07 : 57
- -
-
587
2016-01-14    11 : 59

Photo & Labeling in Site AIS Zone Ayutthaya & Lopburi
18.00
588
2016-01-14    07 : 47
- -
-
589
2016-01-13    09 : 11

Photo in Site at Final BOQ Add AIS Zone Ayutthaya & Lopburi
18.00
590
2016-01-13    07 : 42
- -
-
591
2016-01-12    06 : 36

Photo in Site at Final BOQ Add AIS Zone Ayutthaya & Lopburi
18.00
592
2016-01-11    07 : 40
- -
-
593
2016-01-08    07 : 53
- -
-
594
2016-01-07    06 : 35

Submit Final & Permission PEA AIS Zone Ayutthaya & Lopburi
17.00
595
2016-01-06    07 : 42
- -
-
596
2016-01-05    08 : 19

Submit PEA , FiNAL BOQ AYA , LRI
16.00
597
2016-01-05    08 : 03
- -
-
598
2016-01-04    08 : 07
- -
-
599
2015-12-28    07 : 44

Submit Final BOQ Add P/O AIS Zone Ayutthaya & Lopburi
16.00
600
2015-12-25    07 : 52
- -
-
601
2015-12-24    07 : 52
- -
-
602
2015-12-23    08 : 58

Submit Final add p/o &photo in AIS Zone Ayutthaya & Lopburi
17.00
603
2015-12-23    07 : 44
- -
-
604
2015-12-22    06 : 42

Submit Final BOQ Add P/O AIS Zone Ayutthaya & Lopburi
17.00
605
2015-12-21    07 : 52
- -
-
606
2015-12-18    09 : 58

Return Key Open & Physical AIS Zone Ayutthaya & Lopburi
17.00
607
2015-12-18    07 : 42
- -
-
608
2015-12-17    07 : 31

Photo Tie Cable in Site&Final AIS Zone AYA , SBR , LRI
17.00
609
2015-12-16    07 : 42
- -
-
610
2015-12-15    05 : 55

Meeting shangri la hotel
14.00
611
2015-12-14    07 : 51
- -
-
612
2015-12-11    11 : 59

Inspector Check Final ADD P/O AIS Zone Ayutthaya & Lopburi
18.00
613
2015-12-11    08 : 06
- -
-
614
2015-12-09    09 : 34

Submit Final BOQ Add P/O AIS Zone Ayutthaya & Lopburi
17.00
615
2015-12-09    07 : 49
- -
-
616
2015-12-08    08 : 07

Photo Tie Cable in Site&Final AIS Zone Ayutthaya & Lopburi
17.00
617
2015-12-08    07 : 42
- -
-
618
2015-12-04    07 : 41
- -
-
619
2015-12-03    08 : 04

Photo Tie Cable in Site Final AIS Zone Lopburi
17.00
620
2015-12-03    07 : 51
- -
-
621
2015-12-02    07 : 49
- -
-
622
2015-12-01    06 : 40

Submit Final add P/o& photo in AIS Zone Ayutthaya & Lopburi
17.00
623
2015-11-30    07 : 42
- -
-
624
2015-11-27    09 : 23

Cable to Stock & Photo in Site AIS Zone Ayutthaya Lopburi
17.00
625
2015-11-27    07 : 53
- -
-
626
2015-11-26    07 : 49
- -
-
627
2015-11-25    11 : 55

Photo Tie Cable in Site Final AIS Zone Lopburi
18.00
628
2015-11-25    07 : 43
- -
-
629
2015-11-24    12 : 04

คืนกุญแจที่เบิกมาเปิดเข้า Site AIS Ayutthaya & Lopburi
17.00
630
2015-11-24    07 : 46
- -
-
631
2015-11-23    06 : 34

Photo Tie cable in Site & AMM AIS Zone Ayutthaya Lopburi
18.00
632
2015-11-20    07 : 33
- -
-
633
2015-11-19    06 : 31

Photo Tie Cable in Site Final AIS Ayutthaya & Lopburi
16.00
634
2015-11-18    07 : 54
- -
-
635
2015-11-17    07 : 48
- -
-
636
2015-11-16    10 : 04

Physical Check &Photo in Site AIS Zone Ayutthaya Lopburi
1
637
2015-11-16    07 : 45
- -
-
638
2015-11-13    12 : 18

Photo Tie Cable in Site&Final AIS Zone Ayutthaya
17.00
639
2015-11-13    08 : 13
- -
-
640
2015-11-12    10 : 11

Cable go to AIS&Photo in Site AIS Zone Ayutthaya Lopburi
17.00
641
2015-11-12    07 : 49
- -
-
642
2015-11-11    06 : 28

Photo Tie Cable in Site&Final AIS Zone Ayutthaya Lopburi
18.00
643
2015-11-10    07 : 50
- -
-
644
2015-11-09    06 : 26

Physical Check &Photo in Site AIS Zone Ayutthaya Lopburi
17.00
645
2015-11-06    07 : 50
- -
-
646
2015-11-05    09 : 47

Submit Final BOQ Add P/O AIS Zone Ayutthaya Lopburi
18.00
647
2015-11-05    07 : 30
- -
-
648
2015-11-04    08 : 43

Submit Final BOQ Add P/O AIS Zone Ayutthaya Lopburi
17.00
649
2015-11-04    07 : 49
- -
-
650
2015-11-03    07 : 18
- -
-
651
2015-11-02    06 : 34

Submit Final add p/o& photo in AIS Zone Ayutthaya Lopburi
17.00
652
2015-10-30    07 : 39
- -
-
653
2015-10-29    07 : 42
- -
-
654
2015-10-28    07 : 18
- -
-
655
2015-10-27    06 : 43
- -
-
656
2015-10-26    10 : 28

Physical Check &Photo in Site AIS Zone Ayutthaya Lopburi
17.00
657
2015-10-26    07 : 35
- -
-
658
2015-10-22    11 : 58

Physical Check &Photo in Site AIS Zone Ayutthaya Lopburi
17.00
659
2015-10-22    07 : 22
- -
-
660
2015-10-21    06 : 27

Submit Final add p/o &photo in AIS Zone Ayutthaya Lopburi
17.00
661
2015-10-20    07 : 46
- -
-
662
2015-10-19    12 : 00

Submit Final BOQ Add P/O Inspector AIS Area Lopburi
17.00
663
2015-10-19    07 : 24
- -
-
664
2015-10-16    11 : 58

Submit Final BOQ Add P/O Inspector AIS Zone Lopburi
18.00
665
2015-10-16    07 : 34
- -
-
666
2015-10-15    06 : 56

Physical Check &Photo in Site AIS Area Ayutthaya Angthong
16.00
667
2015-10-14    06 : 59
- -
-
668
2015-10-13    07 : 00

Photo Tie Cable in Site&Final AIS Zone AYA , SBR , LRI
18.00
669
2015-10-12    07 : 26
- -
-
670
2015-10-05    07 : 00

Cheeck Cable and Redline Work AIS Zone Nakhon Sawan
No Return
671
2015-10-02    07 : 45
- -
-
672
2015-10-01    07 : 40
- -
-
673
2015-09-30    07 : 29
- -
-
674
2015-09-29    06 : 34
- -
-
675
2015-09-28    07 : 15
- -
-
676
2015-09-25    12 : 23

Submit Final BOQ Add P/O AIS Zone Ayutthaya Lopburi
18.00
677
2015-09-25    07 : 19
- -
-
678
2015-09-24    11 : 50

Photo Tie cable in Site & AMM AIS Area Ayutthaya Angthong
18.00
679
2015-09-24    07 : 08
- -
-
680
2015-09-23    06 : 35

Submit Final BOQ Add P/O AIS Zone Ayutthaya Lopburi
17.00
681
2015-09-22    07 : 33
- -
-
682
2015-09-21    07 : 25
- -
-
683
2015-09-18    11 : 59

Photo Tie cable in Site & AMM AIS Area Ayutthaya Angthong
17.00
684
2015-09-18    07 : 18
- -
-
685
2015-09-17    07 : 00
- -
-
686
2015-09-16    11 : 58

Photo in Site and Submit AAM AIS Area Ayutthaya + Angthong
17.00
687
2015-09-16    07 : 20
- -
-
688
2015-09-15    10 : 55

Submit Final BOQ AMM & Add p/o AIS Area Ayutthaya + Lopburi
18.00
689
2015-09-15    07 : 17
- -
-
690
2015-09-14    07 : 42
- -
-
691
2015-09-11    06 : 51
- -
-
692
2015-09-10    03 : 01
- -
-
693
2015-09-09    07 : 17
- -
-
694
2015-09-08    06 : 27

Submit AAM ,Photo in Site F/N AIS Area Ayutthaya + Lopburi
17.00
695
2015-09-07    07 : 21
- -
-
696
2015-09-04    07 : 16
- -
-
697
2015-09-03    06 : 30

Photo&Submit Final Add P/O AIS Area AYA +ATG + SRI + SBR
17.00
698
2015-09-02    06 : 59

Submit AAM ,Photo in Site F/N AIS Area Ayutthaya + Lopburi
17.00
699
2015-09-01    07 : 35
- -
-
700
2015-08-31    12 : 06

Submit Final BOQ Add P/O AIS Area Ayutthaya + Lopburi
18.00
701
2015-08-31    07 : 45
- -
-
702
2015-08-28    07 : 51

Physical+ Final BOQ P/O +Photo AIS Area Singburi , Lopburi
17.00
703
2015-08-28    07 : 27
- -
-
704
2015-08-27    07 : 06
- -
-
705
2015-08-26    07 : 40
- -
-
706
2015-08-25    07 : 42

Submit Add P/O,Photo in Site AIS Area Singburi , Lopburi
17.00
707
2015-08-25    07 : 25
- -
-
708
2015-08-25    07 : 23
- -
-
709
2015-08-25    07 : 22
- -
-
710
2015-08-24    06 : 49

Submit Final BOQ Add P/O AIS Area Ayutthaya + Lopburi
17.00
711
2015-08-21    07 : 28
- -
-
712
2015-08-20    07 : 13
- -
-
713
2015-08-19    07 : 48

Recheck Physical & Photo at Fi AIS Area AYA >ATG > SRI > SBR
18.00
714
2015-08-19    07 : 01
- -
-
715
2015-08-18    06 : 47

Final Add P/O and Rephysical AIS Area Ayutthaya + Lopburi
17.00
716
2015-08-17    07 : 44
- -
-
717
2015-08-14    07 : 10

Physical Redline&Photo in site AIS Angthong,Singburi,Ayutthya
17.00
718
2015-08-13    07 : 32
- -
-
719
2015-08-11    07 : 16

Photo in Site and Submit AAM AIS Area Singburi , Lopburi
17.00
720
2015-08-10    07 : 33
- -
-
721
2015-08-07    07 : 02
- -
-
722
2015-08-06    11 : 59

Physical &Photo in site at AAM AIS Area Singburi ,
18.00
723
2015-08-06    07 : 38
- -
-
724
2015-08-05    06 : 49

Physical& Photo in site at AAM Angthong>Singburi>Suthanburi
18.00
725
2015-08-04    11 : 54

Physical &Photo in site at AAM AIS Area Ayutthaya + Angthong
18.00
726
2015-08-04    07 : 20
- -
-
727
2015-08-03    07 : 49
- -
-
728
2015-07-30    07 : 37
- -
-
729
2015-07-29    07 : 53

Physical &Photo in site at AAM AIS Area Ayutthaya + Singburi
17.00
730
2015-07-29    07 : 24
- -
-
731
2015-07-28    06 : 42

Physical &Photo in site at AAM AIS Area Singburi , Lopburi
18.00
732
2015-07-27    07 : 13
- -
-
733
2015-07-24    07 : 10
- -
-
734
2015-07-23    08 : 27

Physical &Photo in site at AAM AIS Area Angthong + Singburi
17.00
735
2015-07-23    06 : 46
- -
-
736
2015-07-22    09 : 44

Photo in Site and Submit AAM AIS Area Angthong + Singburi
17.00
737
2015-07-22    07 : 05
- -
-
738
2015-07-21    06 : 42

Physical &Photo in site at AAM AIS Area Angthong + Singburi
17.00
739
2015-07-20    06 : 36

Physical &Photo in Site at AAM AIS Area Angthong + Singburi
17.00
740
2015-07-17    08 : 30
- -
-
741
2015-07-16    06 : 46

Suport Photo in Site at Final ais zone Lopburi > Singburi
19.00
742
2015-07-15    07 : 35
- -
-
743
2015-07-14    06 : 47

Photo in Site and Submit AAM AIS Area Lopburi > Singburi
18.00
744
2015-07-14    06 : 46

Photo in Site and Submit AAM AIS Area Singburi ,
18.00
745
2015-07-14    06 : 46

Photo in Site and Submit AAM AIS Area Singburi ,
18.00
746
2015-07-13    07 : 33
- -
-
747
2015-07-10    07 : 18

Photo in Site and Submit AAM AIS Area LOPBURI
19.00
748
2015-07-10    07 : 10
- -
-
749
2015-07-09    07 : 36
- -
-
750
2015-07-08    07 : 55

Photo in Site and Submit AAM AIS Aear LRI , SBR , ATG , AYA
17.00
751
2015-07-08    07 : 07
- -
-
752
2015-07-07    06 : 33

Photo in Site at Final BOQ AAM AIS Area LOPBURI
19.00
753
2015-07-06    10 : 01

Photo in Site at Final BOQ AAM AIS Area Ayutthaya + Angthong
18.00
754
2015-07-06    07 : 21
- -
-
755
2015-07-03    12 : 02

Recheck at Redline Final BOQ AIS Area Ayutthaya + Angthong
18.00
756
2015-07-03    07 : 17
- -
-
757
2015-07-02    06 : 55

Photo in Site at Final BOQ AAM AIS Area AYA > LRI > SRI >SBR
17.00
758
2015-07-02    06 : 35
- -
-
759
2015-07-01    06 : 41

Photo in Site and Submit AAM AIS Area LOPBURI
19.00
760
2015-06-30    11 : 55

Photo in Site and Submit AAM ais zone Lopburi > Singburi
19.00
761
2015-06-30    07 : 14
- -
-
762
2015-06-29    08 : 09

Photo in Site and Submit AAM AIS Area Ayutthaya + Lopburi
17.00
763
2015-06-29    07 : 17
- -
-
764
2015-06-25    10 : 13

Photo in Site at Final BOQ AAM AIS Area Lopburi
19.00
765
2015-06-25    07 : 18
- -
-
766
2015-06-24    07 : 23

Photo in Site at Final BOQ AAM AIS Area Singburi , Lopburi
19.00
767
2015-06-24    06 : 51
- -
-
768
2015-06-23    06 : 38

Photo in Site at Final BOQ AAM AIS Area Singburi Lopburi
18.00
769
2015-06-22    09 : 59

Photo in Site at Final BOQ AAM AIS Area Lopburi (BKLFM)
17.00
770
2015-06-22    07 : 19
- -
-
771
2015-06-19    06 : 40

Photo in Site at Final BOQ AAM AIS Area ATG , SRI , SBR ,LRI
19.00
772
2015-06-18    12 : 00

Photo in Site at Final BOQ AAM AIS Area Ayutthaya + Singburi
17.00
773
2015-06-18    07 : 34
- -
-
774
2015-06-17    06 : 35

Photo in Site at Final BOQ AAM AIS Aear LRI , SBR , ATG , AYA
17.00
775
2015-06-16    11 : 58

Photo in Site at Final BOQ AAM AIS Area Ayutthaya + Angthong
18.00
776
2015-06-16    07 : 14
- -
-
777
2015-06-15    06 : 53

Submit AAM ,Photo in Site F/N AIS Area Singburi , Lopburi
19.00
778
2015-06-12    06 : 46
- -
-
779
2015-06-11    06 : 52

Photo in Site and Submit AAM AIS Area Ayutthaya + Lopburi
19.00
780
2015-06-10    07 : 16
- -
-
781
2015-06-09    06 : 38

Photo in Site at Final BOQ AAM AIS Area Ayutthaya + Lopburi
18.00
782
2015-06-08    08 : 49

Photo in Site and Submit AAM AIS Area Ayutthaya + Lopburi
17.00
783
2015-06-08    07 : 32
- -
-
784
2015-06-05    06 : 43

Photo in Site and Submit AAM AIS Area Ayutthaya + Lopburi
18.00
785
2015-06-04    07 : 26
- -
-
786
2015-06-03    06 : 50

Photo in Site at Final BOQ AAM AIS Area Ayutthaya + Lopburi
17.00
787
2015-06-02    06 : 38

Photo in Site at Final BOQ AAM AIS Area AYA > LBR > SRI > ATG
18.00
788
2015-05-29    06 : 55

Photo in Site at Final BOQ AAM AIS Area Ayutthaya + Lopburi
17.00
789
2015-05-28    06 : 48

Photo in Site at Final BOQ AAM AIS Area Lopburi
18.00
790
2015-05-27    10 : 10

Photo in Site at Final BOQ AAM AIS Area Lopburi
18.00
791
2015-05-27    07 : 13
- -
-
792
2015-05-26    07 : 01

Photo in Site at Final BOQ AAM AIS Area Ayutthaya + Lopburi
18.00
793
2015-05-25    06 : 32

Photo at Site in Final BOQ AIS Area AYA > LBR > SRI > ATG
18.00
794
2015-05-22    06 : 33

Photo in Site at Final BOQ AAM AIS Area AYA +ATG + SRI + SBR
18.00
795
2015-05-21    07 : 33
- -
-
796
2015-05-20    06 : 25

Photo at Site in Final BOQ AIS Area AYA >ATG > SRI > SBR
18.00
797
2015-05-19    06 : 32

Photo in Site at Final BOQ Ais AYA , ATG , SBI
18.00
798
2015-05-18    07 : 19
- -
-
799
2015-05-15    07 : 18
- -
-
800
2015-05-14    06 : 36

AAM &Survey HNKAM-DBNBM AIS Area AYA , LRI , SPB , Han
18.00
801
2015-05-13    12 : 21

AAM &Final BOQ go to Inspector AIS Area Ayutthaya + Lopburi
18.00
802
2015-05-13    07 : 21
- -
-
803
2015-05-12    10 : 32

AAM &Final BOQ go to Inspector AIS Area Lopburi
17.00
804
2015-05-12    07 : 12
- -
-
805
2015-05-11    09 : 37

AAM &Survey HNKAM-DBNBM AIS AyA , Suphanburi , Chainat
18.00
806
2015-05-11    07 : 47
- -
-
807
2015-05-08    07 : 37
- -
-
808
2015-05-07    06 : 34

AAM &Survey HNKAM-DBNBM AIS AyA , Suphanburi , Chainat
17.00
809
2015-05-06    08 : 10
- -
-
810
2015-04-30    05 : 58

Route HNKAM - DBNBM & AAM AIS Suphanburi - Nakhnonsawan
17.00
811
2015-04-29    07 : 35
- -
-
812
2015-04-28    12 : 01

AAM &Survey HNKAM-DBNBM AIS Area AYA , SPB
18.00
813
2015-04-28    07 : 40
- -
-
814
2015-04-27    06 : 22
- -
-
815
2015-04-24    07 : 49
- -
-
816
2015-04-23    10 : 52

AMM&Final BOQ&AS-Built Draw AIS Area Lopburi
16.00
817
2015-04-23    07 : 38
- -
-
818
2015-04-22    07 : 28
- -
-
819
2015-04-21    06 : 22

AAM &Final BOQ go to Inspector AIS Area AYA , LRI
17.00
820
2015-04-20    06 : 21

AMM & Final BOQ & AS-Built AIS Area Ayutthaya + Lopburi
16.00
821
2015-04-17    07 : 32
- -
-
822
2015-04-16    08 : 30
- -
-
823
2015-04-10    11 : 59

Rechec Physical Cutover & AAM AIS Area AYA +ATG + SRI + SBR
17.00
824
2015-04-10    07 : 45
- -
-
825
2015-04-09    10 : 39

AMM & Final BOQ & AS-Built AIS Area AYA +ATG + SRI + SBR
16.00
826
2015-04-09    07 : 45
- -
-
827
2015-04-08    10 : 09

Rechec Joint After Cutover AIS Area AYA >ATG > SBR
17.00
828
2015-04-08    07 : 50
- -
-
829
2015-04-07    07 : 55
- -
-
830
2015-04-03    10 : 39

Rechec Joint After Cutover AIS Area AYA +ATG + SRI + SBR
17.00
831
2015-04-03    07 : 44
- -
-
832
2015-04-02    10 : 04

CutoverPBNG/SBTH - KSNS AIS Area AYA - SBR
17.00
833
2015-04-02    07 : 46
- -
-
834
2015-04-01    11 : 58

Rechec Physical After Cutover AIS Area AYA >ATG
16.00
835
2015-04-01    07 : 48
- -
-
836
2015-03-31    06 : 14

AMM&Final BOQ&AS-Built Draw AIS Area AYA > LBR > SRI >SBR
16.00
837
2015-03-30    10 : 16

Rechec Physical Cutover & AAM AIS Area Ayutthaya + Lopburi
17.00
838
2015-03-30    07 : 51
- -
-
839
2015-03-27    09 : 37

Rechec Physical After Cutover AIS Area AYA >ATG > SRI > SBR
18.00
840
2015-03-27    08 : 05
- -
-
841
2015-03-26    01 : 17
- -
-
842
2015-03-25    11 : 57

AMM&Final BOQ&AS-Built Draw AIS Area Ayutthaya + Lopburi
18.00
843
2015-03-25    07 : 49
- -
-
844
2015-03-24    07 : 41
- -
-
845
2015-03-23    11 : 43

AMM&Final BOQ&AS-Built Draw AIS Area Ayutthaya + Lopburi
18.00
846
2015-03-23    07 : 52
- -
-
847
2015-03-20    09 : 29

Cutover 96C MITA - BNIN/CRKN AIS Area Ayutthaya
17.00
848
2015-03-20    08 : 01
- -
-
849
2015-03-19    02 : 12
- -
-
850
2015-03-18    04 : 12
- -
-
851
2015-03-18    06 : 30

AMM&Final BOQ&AS-Built Draw AIS Area AYA > LRI > SRI >SBR
17.00
852
2015-03-17    07 : 30
- -
-
853
2015-03-16    06 : 36

AMM & Final BOQ & AS-Built AIS Area Ayutthaya + Lopburi
17.00
854
2015-03-13    06 : 37

AMM & Final BOQ & AS-Built AIS Area AYA > LRI > SRI >SBR
17.00
855
2015-03-12    10 : 24

AMM & Final BOQ & AS-Built AIS Area Ayutthaya + Lopburi
17.00
856
2015-03-12    07 : 33
- -
-
857
2015-03-11    01 : 24
- -
-
858
2015-03-10    06 : 37

AMM & Final BOQ & AS-Built AIS Zone Ayutthaya + Lopburi
17.00
859
2015-03-09    07 : 48
- -
-
860
2015-03-06    06 : 47
- -
-
861
2015-03-05    11 : 09

Cutover and Final AS Built AIS Area Ayutthaya + Singburi
17.00
862
2015-03-05    08 : 00
- -
-
863
2015-03-03    04 : 12
- -
-
864
2015-03-02    11 : 59

Cutover HTPA / PDPN - BHAE AIS Area Ayutthaya + Angthong
17.00
865
2015-03-02    08 : 01
- -
-
866
2015-02-27    09 : 13

Cutover & Add Site SNBS,KATM AIS Area AYA >ATG
17.00
867
2015-02-27    07 : 58
- -
-
868
2015-02-26    09 : 07

Cutover 96C SEN / PKH1 - KATM AIS Area AYA >ATG
17.00
869
2015-02-26    07 : 54
- -
-
870
2015-02-25    07 : 20

Final As Built Drawing & AMM AIS Area AYA +ATG + SRI + SBR
16.00
871
2015-02-24    08 : 57

Recheck final As Built Drawing AIS Area AYA > LBR > SRI >SBR
17.00
872
2015-02-24    08 : 09
- -
-
873
2015-02-23    07 : 48
- -
-
874
2015-02-20    07 : 58
- -
-
875
2015-02-19    07 : 47

Rechec Physical Cutover & AAM AIS Area AYA > LBR > SRI >SBR
16.00
876
2015-02-18    07 : 47
- -
-
877
2015-02-17    07 : 09

Rechec Physical Cutover & AAM AIS Area Ayutthaya + Lopburi
17.00
878
2015-02-16    07 : 27
- -
-
879
2015-02-13    11 : 58

Submit Final BOQ and AAM AIS Area Ayutthaya + Lopburi
18.00
880
2015-02-13    11 : 58

Submit Final BOQ and AAM AIS Area Ayutthaya + Lopburi
18.00
881
2015-02-13    07 : 48
- -
-
882
2015-02-12    09 : 11

R/C Redline Design FinalBOQ AIS Area AYA +ATG + SRI + SBR
17.00
883
2015-02-12    08 : 01
- -
-
884
2015-02-11    07 : 45
- -
-
885
2015-02-11    07 : 44
- -
-
886
2015-02-10    09 : 03

R/CRedline at Design FinalBOQ AIS Area AYA +ATG + SRI + SBR
17.00
887
2015-02-10    07 : 50
- -
-
888
2015-02-09    09 : 19

Rechec Physical Cutover & D/D AIS Area AYA +ATG + SRI + SBR
17.00
889
2015-02-09    09 : 18

Rechec Physical Cutover & D/D AIS Area AYA +ATG + SRI + SBR
17.00
890
2015-02-09    07 : 26
- -
-
891
2015-02-06    09 : 36

Rechec Physical Cutover & AAM AIS Area AYA +ATG + SRI + SBR
18.00
892
2015-02-06    07 : 25
- -
-
893
2015-02-05    08 : 57

Rechec Physical After Cutover AIS Area AYA >ATG > SBR
18.00
894
2015-02-05    07 : 16
- -
-
895
2015-02-04    08 : 57

Rechec Physical After Cutover AIS Area AYA +ATG + SRI + SBR
17.00
896
2015-02-04    07 : 58
- -
-
897
2015-02-03    08 : 15

Rechec Physical After Cutover AIS Area AYA +ATG + SRI + SBR
17.00
898
2015-02-03    07 : 58
- -
-
899
2015-02-02    07 : 57
- -
-
900
2015-01-30    06 : 59

R/CRedline at Design FinalBOQ AIS Area AYA +ATG + SRI + SBR
17.00
901
2015-01-29    08 : 01
- -
-
902
2015-01-28    09 : 27

Redline & Final BOQ & PAT AIS Area Ayutthaya + Lopburi
18.00
903
2015-01-28    07 : 33
- -
-
904
2015-01-27    07 : 55
- -
-
905
2015-01-26    09 : 10

Recheck at Redline Final BOQ AIS Area Ayutthaya + Angthong
17.00
906
2015-01-26    08 : 00
- -
-
907
2015-01-23    07 : 59
- -
-
908
2015-01-22    09 : 19

Redline at Design Cheeck Route AIS Area AYA > ATG > SRI >SBR
17.00
909
2015-01-22    08 : 01
- -
-
910
2015-01-21    07 : 18

PAT + Final BOQ + AAM AIS Area AYA >ATG > SRI > SBR
18.00
911
2015-01-20    07 : 58
- -
-
912
2015-01-19    11 : 55

Submit Final BOQ After PAT AIS Zone AYA >ATG > SRI > SBR
16.00
913
2015-01-19    08 : 28
- -
-
914
2015-01-16    08 : 00
- -
-
915
2015-01-15    02 : 54

AAM &Final BOQ go to Inspector AIS Ayutthaya OFFICE
18.00
916
2015-01-15    07 : 48
- -
-
917
2015-01-14    12 : 30

Redline & Final BOQ Before PAT AIS Area AYA > ATG > SRI >SBR
18.00
918
2015-01-14    08 : 02
- -
-
919
2015-01-13    08 : 42

Redline & Final BOQ Before PAT AIS Area Ayutthaya + Angthong
16.00
920
2015-01-13    08 : 41

Redline & Final BOQ Before PAT AIS Area Ayutthaya + Angthong
16
921
2015-01-13    08 : 01
- -
-
922
2015-01-12    07 : 43
- -
-
923
2015-01-09    07 : 48
- -
-
924
2015-01-08    08 : 14

AAM &Final BOQ go to Inspector Area Ayutthaya > Lopburi
16.00
925
2015-01-08    07 : 40
- -
-
926
2015-01-07    07 : 38

Redline & Final BOQ Before PAT AIS Area Ayutthaya + Lopburi
17.00
927
2015-01-06    07 : 53
- -
-
928
2015-01-05    10 : 14
- -
-
929
2014-12-25    07 : 46
- -
-
930
2014-12-24    08 : 31

Physical After PAT& Final BOQ AIS Area AYA +ATG + SRI + SBR
17.00
931
2014-12-24    08 : 03
- -
-
932
2014-12-23    07 : 56
- -
-
933
2014-12-22    09 : 19

AAM &Final BOQ go to Inspector AIS Ayutthaya OFFICE
17.00
934
2014-12-22    07 : 47
- -
-
935
2014-12-19    07 : 56
- -
-
936
2014-12-18    08 : 04
- -
-
937
2014-12-17    06 : 58

PAT + Final BOQ +AAM Working AIS Area Ayutthaya + Lopburi
17.00
938
2014-12-15    07 : 38
- -
-
939
2014-12-12    07 : 43
- -
-
940
2014-12-11    07 : 50
- -
-
941
2014-12-09    08 : 16

PAT + Final BOQ +AAM Working AIS Area AYA > LBR > SRI >SBR
18.00
942
2014-12-09    07 : 44
- -
-
943
2014-12-08    12 : 05

Final BOQ And AAM Working AIS Area Ayutthaya + Lopburi
18.00
944
2014-12-08    07 : 48
- -
-
945
2014-12-04    07 : 07

PAT + Final BOQ +AAM Working AIS Area AYA > LBR > SRI >SBR
17.00
946
2014-12-03    07 : 56
- -
-
947
2014-12-02    08 : 07

AAM &FINAL BOQ go to Inspector AIS Area Ayutthaya + Lopburi
17.00
948
2014-12-02    07 : 50
- -
-
949
2014-12-01    07 : 56
- -
-
950
2014-11-28    12 : 06

Prepare Core&Reconfigure Work AIS Ayutthayaand Redline check
18.00
951
2014-11-28    07 : 48
- -
-
952
2014-11-27    11 : 23

Prepare Core&Reconfigure Work Ayutthaya Control Working
18.00
953
2014-11-27    07 : 35
- -
-
954
2014-11-26    07 : 59

Check Redline+Final BOQ+AMM AIS Area AYA +ATG + SRI + SBR
17.00
955
2014-11-26    07 : 51
- -
-
956
2014-11-25    07 : 48
- -
-
957
2014-11-24    11 : 57

Control team Reconfig & Final AIS Ayutthaya
17.00
958
2014-11-24    07 : 57
- -
-
959
2014-11-24    07 : 56
- -
-
960
2014-11-21    07 : 02

AAM &FINAL BOQ go to Inspector AIS Area Ayutthaya + Lopburi
16.00
961
2014-11-20    07 : 58
- -
-
962
2014-11-19    07 : 05

Redline & Final BOQ Before PAT AIS Area AYA +ATG + SRI + SBR
17.00
963
2014-11-18    07 : 59
- -
-
964
2014-11-17    11 : 59

Physical Before PAT& Final BOQ Area AYA >ATG > SRI > SBR
17.00
965
2014-11-17    07 : 45
- -
-
966
2014-11-14    07 : 25
- -
-
967
2014-11-13    11 : 43

Submit Final BOQ After PAT AIS Area Ayutthaya + Lopburi
18.00
968
2014-11-13    07 : 19
- -
-
969
2014-11-12    07 : 16
- -
-
970
2014-11-11    07 : 39
- -
-
971
2014-11-10    07 : 28
- -
-
972
2014-11-08    09 : 06
- -
-
973
2014-11-07    06 : 51

Physical After PAT& Final BOQ AIS Area AYA >ATG > SRI > SBR
17.00
974
2014-11-06    07 : 12
- -
-
975
2014-11-05    07 : 06

PAT Working & Final BOQ AIS Area AYA >ATG > SRI > SBR
19.00
976
2014-11-04    08 : 33

PAT Working & Final BOQ AIS Area AYA > ATG > SRI >SBR
18.00
977
2014-11-04    07 : 37
- -
-
978
2014-11-03    07 : 32
- -
-
979
2014-10-31    07 : 43

PAT Working & Final BOQ AIS Area AYA >ATG > SRI > SBR
18.00
980
2014-10-31    07 : 38
- -
-
981
2014-10-30    08 : 12
- -
-
982
2014-10-29    07 : 54
- -
-
983
2014-10-28    07 : 47
- -
-
984
2014-10-27    10 : 31

Physscal Before PAT&Final BOQ Area AYA >ATG > SRI > SBR
17.00
985
2014-10-27    07 : 47
- -
-
986
2014-10-24    09 : 09

PAT& Final BOQ Working AIS Area AYA >ATG > SBR
18.00
987
2014-10-24    07 : 49
- -
-
988
2014-10-22    07 : 45

Physical After PAT& Final BOQ AIS Area Ayutthaya + Angthong
17.00
989
2014-10-22    07 : 36
- -
-
990
2014-10-21    08 : 03
- -
-
991
2014-10-20    07 : 56
- -
-
992
2014-10-17    07 : 55
- -
-
993
2014-10-16    06 : 59

Final BOQ & AAM Signature AIS Area Ayutthaya + Lopburi
17.00
994
2014-10-15    02 : 36

Final BOQ & AAM Signature AIS Ayutthaya OFFICE
18.00
995
2014-10-15    07 : 48
- -
-
996
2014-10-14    07 : 54

Physical Before PAT&Final BOQ Area AYA >ATG > SRI > SBR
18.00
997
2014-10-14    07 : 46
- -
-
998
2014-10-13    07 : 53
- -
-
999
2014-10-10    07 : 26

Control Cable MBBI & Final BOQ AIS Area Ayutthaya
18.00
1000
2014-10-10    07 : 13
- -
-
1001
2014-10-09    06 : 06

Control Cable MINIBEA (MBBI) AIS Area Ayutthaya
18.00
1002
2014-10-08    06 : 03

Control Cable MINIBEA (MBBI) AIS Area Ayutthaya
18.00
1003
2014-10-03    06 : 32

Physical Before PAT&Final BOQ Area AYA >ATG > SRI > SBR
17.00
1004
2014-10-02    07 : 47
- -
-
1005
2014-10-01    07 : 40
- -
-
1006
2014-09-30    07 : 09

Final BOQ&Physical Before PAT Area AYA >ATG > SRI > SBR
17.00
1007
2014-09-29    08 : 04
- -
-
1008
2014-09-26    11 : 57

Final BOQ Inspector Signature AIS Ayutthaya OFFICE
16.00
1009
2014-09-26    07 : 48
- -
-
1010
2014-09-25    08 : 04

PAT Working & Final BOQ AIS Area AYA > ATG > SRI >SBR
18.00
1011
2014-09-25    07 : 09
- -
-
1012
2014-09-24    10 : 52

Physical Before PAT& Final BOQ AIS Area Ayutthaya + Angthong
17.00
1013
2014-09-24    07 : 34
- -
-
1014
2014-09-23    10 : 18

Submit Final BOQ After PAT AIS Area Ayutthaya + Angthong
17.00
1015
2014-09-23    07 : 39
- -
-
1016
2014-09-22    07 : 51
- -
-
1017
2014-09-19    07 : 47
- -
-
1018
2014-09-18    07 : 46
- -
-
1019
2014-09-17    07 : 25
- -
-
1020
2014-09-16    08 : 13

Physical Before PAT&Final BOQ AIS Area Ayutthaya + Angthong
16.00
1021
2014-09-16    07 : 42
- -
-
1022
2014-09-15    07 : 38
- -
-
1023
2014-09-13    08 : 23
- -
-
1024
2014-09-12    07 : 06

AAM &FINAL BOQ go to Inspector AIS Area Ayutthaya + Lopburi
16.00
1025
2014-09-11    07 : 13

Final BOQ & AAM Signature AIS Area AYA >ATG > SBR
16.00
1026
2014-09-10    07 : 32
- -
-
1027
2014-09-09    07 : 02

PAT Working & Final BOQ AIS Area Ayutthaya + Angthong
18.00
1028
2014-09-08    07 : 22
- -
-
1029
2014-09-06    07 : 43
- -
-
1030
2014-09-05    08 : 17

PAT Working & Final BOQ AIS Area AYA >ATG > SBR
17.00
1031
2014-09-05    07 : 17
- -
-
1032
2014-09-04    08 : 42

Physscal Before PAT&Final BOQ AIS Area Ayutthaya + Angthong
17.00
1033
2014-09-04    07 : 45
- -
-
1034
2014-09-03    07 : 36
- -
-
1035
2014-09-02    12 : 43

Outside RedLine at Final BOQ AIS Area AYA >ATG > SBR
17.00
1036
2014-09-02    07 : 40
- -
-
1037
2014-09-01    07 : 48
- -
-
1038
2014-08-30    09 : 27
- -
-
1039
2014-08-29    07 : 58
- -
-
1040
2014-08-28    07 : 52
- -
-
1041
2014-08-27    07 : 45
- -
-
1042
2014-08-26    07 : 08

PAT & Final BOQ Working AIS Area Ayutthaya + Angthong
17.00
1043
2014-08-26    07 : 00
- -
-
1044
2014-08-25    07 : 12

PAT Working & Final BOQ AIS Area AYA >ATG > SBR
18.00
1045
2014-08-23    08 : 41
- -
-
1046
2014-08-22    07 : 48
- -
-
1047
2014-08-21    08 : 02
- -
-
1048
2014-08-20    08 : 20

Outside PAT & Final BOQ Area Ayutthaya + Angthong
17.00
1049
2014-08-20    07 : 41
- -
-
1050
2014-08-19    07 : 57
- -
-
1051
2014-08-18    07 : 47
- -
-
1052
2014-08-15    07 : 51
- -
-
1053
2014-08-14    09 : 09

Outside PAT&FinalBOQ Working AIS Area AYA >ATG > SBR
18.00
1054
2014-08-14    07 : 31
- -
-
1055
2014-08-13    07 : 30
- -
-
1056
2014-08-08    07 : 18
- -
-
1057
2014-08-07    07 : 43
- -
-
1058
2014-08-06    07 : 59
- -
-
1059
2014-08-05    08 : 07

Physical After PAT&Final BOQ AIS Area AYA > ATG > SRI >SBR
17.00
1060
2014-08-05    07 : 32
- -
-
1061
2014-08-04    07 : 40
- -
-
1062
2014-08-01    07 : 20
- -
-
1063
2014-07-31    07 : 44
- -
-
1064
2014-07-30    07 : 29
- -
-
1065
2014-07-29    07 : 33

PAT Working & Final BOQ AIS Area Ayutthaya + Angthong
19.00
1066
2014-07-29    07 : 04
- -
-
1067
2014-07-28    07 : 21
- -
-
1068
2014-07-25    07 : 59

PAT Working & Final BOQ AIS Area AYA >ATG > SBR
18.00
1069
2014-07-25    07 : 33
- -
-
1070
2014-07-24    07 : 21
- -
-
1071
2014-07-23    07 : 11
- -
-
1072
2014-07-22    07 : 44
- -
-
1073
2014-07-21    07 : 40
- -
-
1074
2014-07-16    07 : 37
- -
-
1075
2014-07-15    09 : 47

Physical Before PAT& Final BOQ AIS Area Ayutthaya + Angthong
17.00
1076
2014-07-15    07 : 20
- -
-
1077
2014-07-14    07 : 54
- -
-
1078
2014-07-10    07 : 37
- -
-
1079
2014-07-09    07 : 37
- -
-
1080
2014-07-08    07 : 07
- -
-
1081
2014-07-07    07 : 37
- -
-
1082
2014-07-05    07 : 27
- -
-
1083
2014-07-04    07 : 35
- -
-
1084
2014-07-03    07 : 54

PAT Working & Final BOQ AIS Area Ayutthaya + Angthong
18.00
1085
2014-07-03    07 : 17
- -
-
1086
2014-07-02    07 : 42
- -
-
1087
2014-07-01    07 : 59
- -
-
1088
2014-06-30    07 : 41
- -
-
1089
2014-06-27    07 : 39
- -
-
1090
2014-06-26    08 : 07
- -
-
1091
2014-06-25    07 : 52
- -
-
1092
2014-06-24    07 : 36
- -
-
1093
2014-06-23    07 : 52
- -
-
1094
2014-06-21    07 : 11
- -
-
1095
2014-06-20    10 : 13

Cutover Cable 48c YCPK-TLA1 AIS Area AYA - SBR
18.00
1096
2014-06-20    07 : 18
- -
-
1097
2014-06-19    07 : 26
- -
-
1098
2014-06-18    12 : 44

Cutover Cable 48c RJNA-YAYA Area AIS Ayutthaya + Angthong
20.00
1099
2014-06-18    07 : 52
- -
-
1100
2014-06-17    08 : 02

Physscal Before PAT&Final BOQ AIS Area AYA > ATG > SRI >SBR
18.00
1101
2014-06-17    07 : 45
- -
-
1102
2014-06-16    07 : 42
- -
-
1103
2014-06-13    07 : 47
- -
-
1104
2014-06-12    08 : 11
- -
-
1105
2014-06-11    07 : 33
- -
-
1106
2014-06-10    08 : 02

Physical Before PAT& Final BOQ Area AIS AYA + ATG + SBR
18.00
1107
2014-06-10    07 : 46
- -
-
1108
2014-06-09    07 : 46
- -
-
1109
2014-06-06    08 : 41

Cutover Cable 96c WCYI-NLG Area Ayutthaya + Angthong
20.00
1110
2014-06-06    07 : 24
- -
-
1111
2014-06-05    08 : 06
- -
-
1112
2014-06-04    07 : 25
- -
-
1113
2014-06-03    10 : 04

Cutover Cable 96c SANG-RJNA Area Ayutthaya + Angthong
20.00
1114
2014-06-03    07 : 25
- -
-
1115
2014-06-02    09 : 35

Cutover Cable 96c RJNA-WNI.1 Area AYA (งาน เสาหักโดนพายุ)
20.00
1116
2014-06-02    07 : 17
- -
-
1117
2014-05-30    12 : 21

Physical After PAT&Final BOQ Area AIS AYA +ATG+SBR
18.00
1118
2014-05-30    07 : 12
- -
-
1119
2014-05-29    07 : 18

PAT work & Final BOQ work AIS Area AYA >ATG > SRI
19.00
1120
2014-05-28    10 : 27

Outside @@ Final PAT Working AIS Area AYA >ATG > SBR
17.00
1121
2014-05-28    07 : 43
- -
-
1122
2014-05-27    07 : 45
- -
-
1123
2014-05-26    07 : 33
- -
-
1124
2014-05-24    08 : 36
- -
-
1125
2014-05-23    07 : 46
- -
-
1126
2014-05-22    07 : 41
- -
-
1127
2014-05-21    07 : 45
- -
-
1128
2014-05-20    07 : 58
- -
-
1129
2014-05-19    07 : 51
- -
-
1130
2014-05-16    07 : 43

Work Final BOQ & PAT Working AIS Area AYA >ATG > SBR
18.00
1131
2014-05-16    07 : 37
- -
-
1132
2014-05-15    07 : 42
- -
-
1133
2014-05-14    07 : 55
- -
-
1134
2014-05-12    12 : 04

Outside Inspector Check PAT AIS Area AYA > ATG > SRI >SBR
18.00
1135
2014-05-12    07 : 41
- -
-
1136
2014-05-09    07 : 43
- -
-
1137
2014-05-08    07 : 48
- -
-
1138
2014-05-07    08 : 14

Outside Route Survey Working AIS Area AYA >ATG > SRI > SBR
17.00
1139
2014-05-07    07 : 36
- -
-
1140
2014-05-06    07 : 42
- -
-
1141
2014-05-02    07 : 54
- -
-
1142
2014-04-30    07 : 49
- -
-
1143
2014-04-29    07 : 47

PAT workin & Final BOQ AIS Area AYA > ATG > SRI >SBR
18.00
1144
2014-04-28    07 : 44
- -
-
1145
2014-04-25    07 : 48
- -
-
1146
2014-04-25    07 : 47
- -
-
1147
2014-04-24    07 : 51
- -
-
1148
2014-04-23    06 : 43

Submit Final BOQ After PAT+OSP AIS Area Ayutthaya + Lopburi
16.00
1149
2014-04-22    10 : 31

Inspector Check Civil & Cable Area AIS Ayutthaya + Angthong
16.00
1150
2014-04-22    07 : 58
- -
-
1151
2014-04-21    07 : 53
- -
-
1152
2014-04-18    07 : 57
- -
-
1153
2014-04-18    07 : 56
- -
-
1154
2014-04-17    08 : 22
- -
-
1155
2014-04-09    08 : 12
- -
-
1156
2014-04-08    11 : 59

Physscal Before PAT&Final BOQ Area Ayutthaya + Angthong
16.00
1157
2014-04-08    07 : 44
- -
-
1158
2014-04-02    08 : 07
- -
-
1159
2014-04-01    07 : 59

PAT & Final BOQ Working Area Angthong > Singburi
18.00
1160
2014-04-01    07 : 46
- -
-
1161
2014-03-31    07 : 52
- -
-
1162
2014-03-28    07 : 54
- -
-
1163
2014-03-27    07 : 52
- -
-
1164
2014-03-26    07 : 28

PATWorking & Final BOQ AIS Area Angthong > Singburi
18.00
1165
2014-03-25    07 : 57
- -
-
1166
2014-03-24    07 : 57
- -
-
1167
2014-03-21    08 : 18

Inspector Survey Civil & Cable AIS Area Angthong > Singburi
16.00
1168
2014-03-21    07 : 49
- -
-
1169
2014-03-20    08 : 07
- -
-
1170
2014-03-18    07 : 31

PAT & Final BOQ Working Area Angthong > Singburi
18.00
1171
2014-03-18    07 : 22
- -
-
1172
2014-03-17    07 : 53
- -
-
1173
2014-03-14    07 : 40
- -
-
1174
2014-03-13    08 : 06
- -
-
1175
2014-03-12    08 : 13

Physical Before PAT& Final BOQ AIS Area AYA > ATG > SRI >SBR
17.00
1176
2014-03-12    07 : 52
- -
-
1177
2014-03-11    07 : 56
- -
-
1178
2014-03-10    07 : 56
- -
-
1179
2014-03-07    07 : 58
- -
-
1180
2014-03-06    07 : 47
- -
-
1181
2014-03-05    07 : 23

PAT Working & Final BOQ Area AIS Ayutthaya + Angthong
18.00
1182
2014-03-04    07 : 17

Final BOQ&Physical Before PAT Area AYA >ATG > SRI > SBR
17.00
1183
2014-03-04    07 : 15
- -
-
1184
2014-03-03    07 : 55
- -
-
1185
2014-02-28    07 : 41
- -
-
1186
2014-02-27    08 : 48

Physical Before PAT&Final BOQ Area AIS Ayutthaya + Angthong
17.00
1187
2014-02-27    07 : 59
- -
-
1188
2014-02-26    08 : 01
- -
-
1189
2014-02-25    07 : 48

Final BOQ + Recheck Redline Area Ayutthaya + Angthong
16.00
1190
2014-02-24    07 : 40
- -
-
1191
2014-02-21    07 : 34

PAT Working & Final BOQ AIS Area AYA > ATG > SRI >SBR
18.00
1192
2014-02-20    07 : 45
- -
-
1193
2014-02-19    08 : 43

PAT & Final BOQ Working Area Ayutthaya + Angthong
18.00
1194
2014-02-19    07 : 47
- -
-
1195
2014-02-18    07 : 53
- -
-
1196
2014-02-17    12 : 00

Final BOQ Inspector Signature AIS Area Ayutthaya OFFICE
15.00
1197
2014-02-17    07 : 49
- -
-
1198
2014-02-13    07 : 49

Final BOQ and working PAT AIS Area AYA > ATG > SRI >SBR
18.00
1199
2014-02-13    07 : 37
- -
-
1200
2014-02-12    09 : 15

Physscal Before PAT&Final BOQ AIS Area AyA + SBR + LBR
17.00
1201
2014-02-12    07 : 46
- -
-
1202
2014-02-11    08 : 19

Physical Ckeck Before PAT AIS Area AYA > SRI > SBR
17.00
1203
2014-02-11    07 : 46
- -
-
1204
2014-02-10    07 : 59
- -
-
1205
2014-02-07    07 : 17

route survey redline before pa ais area sri >sbr >atg >aya
17.00
1206
2014-02-07    07 : 09
- -
-
1207
2014-02-06    07 : 57
- -
-
1208
2014-02-05    08 : 44

Checking RedLine Before PAT AIS Area AYA > LBR > SRI >SBR
17.00
1209
2014-02-05    07 : 45
- -
-
1210
2014-02-04    08 : 02
- -
-
1211
2014-02-03    07 : 55
- -
-
1212
2014-01-31    07 : 58

PAT Working & Final BOQ Area AYA >ATG > SRI > SBR
17.00
1213
2014-01-31    07 : 30
- -
-
1214
2014-01-30    07 : 46
- -
-
1215
2014-01-29    08 : 24

Prepare Core Site to Site&PAT AIS Area AYA > ATG > SRI
18.00
1216
2014-01-29    07 : 52
- -
-
1217
2014-01-28    09 : 05

Patch Core Work Site to Site Area Ayutthaya + Angthong
18.00
1218
2014-01-28    07 : 50
- -
-
1219
2014-01-27    07 : 17

Submit Final BOQ After PAT+OSP Area Ayutthaya + Angthong
17.00
1220
2014-01-24    08 : 04
- -
-
1221
2014-01-23    10 : 17

Submit Final BOQ After PAT+OSP AIS Area Ayutthaya + Lopburi
17.00
1222
2014-01-23    08 : 07
- -
-
1223
2014-01-22    07 : 58
- -
-
1224
2014-01-21    09 : 38

Outside PAT&Final BOQ After Area Angthong > Singburi
17.00
1225
2014-01-21    08 : 06
- -
-
1226
2014-01-20    07 : 48
- -
-
1227
2014-01-17    08 : 09

PAT & Final BOQ Working Area Angthong > Singburi
18.00
1228
2014-01-17    07 : 57
- -
-
1229
2014-01-16    07 : 54
- -
-
1230
2014-01-15    07 : 57

Outside Route Survey & Final AIS Area AYA >ATG > SRI
17.00
1231
2014-01-15    07 : 54
- -
-
1232
2014-01-14    08 : 03
- -
-
1233
2014-01-13    08 : 05
- -
-
1234
2014-01-10    07 : 31

Submit Final BOQ Survey Route AIS Area AYA > LBR > SRI >SBR
18.00
1235
2014-01-09    07 : 53
- -
-
1236
2014-01-08    08 : 01

Survey Redline at Final BOQ Area Angthong > Singburi
17.00
1237
2014-01-08    07 : 46
- -
-
1238
2014-01-07    07 : 52
- -
-
1239
2014-01-06    07 : 47
- -
-
1240
2013-12-27    07 : 49
- -
-
1241
2013-12-26    08 : 03

Submit Final BOQ After PAT AIS Area Ayutthaya + Lopburi
16.00
1242
2013-12-26    08 : 02
- -
-
1243
2013-12-25    07 : 24

Submit Final BOQ After PAT AIS Area Ayutthaya OFFICE
16.00
1244
2013-12-24    07 : 42
- -
-
1245
2013-12-23    07 : 44
- -
-
1246
2013-12-20    07 : 37
- -
-
1247
2013-12-19    08 : 13
- -
-
1248
2013-12-18    07 : 37

PAT & Final BOQ Working Area AIS Ayutthaya + Saraburi
18.00
1249
2013-12-18    07 : 30
- -
-
1250
2013-12-17    07 : 35

PAT Working & Final BOQ Area Ayutthaya + Angthong
17.00
1251
2013-12-16    07 : 59
- -
-
1252
2013-12-12    07 : 46
- -
-
1253
2013-12-11    07 : 26

Submit Final BOQ After PAT Area AIS Ayutthaya + Angthong
16.00
1254
2013-12-09    07 : 49
- -
-
1255
2013-12-06    07 : 37
- -
-
1256
2013-12-04    08 : 02
- -
-
1257
2013-12-03    07 : 34

PAT WORKING & Final BOQ Area Angthong > Suphanburi
18.00
1258
2013-12-02    07 : 49
- -
-
1259
2013-11-29    07 : 33
- -
-
1260
2013-11-28    08 : 06
- -
-
1261
2013-11-27    08 : 16

RedLine Checking Before PAT Area Ayutthaya + Angthong
17.00
1262
2013-11-27    07 : 47
- -
-
1263
2013-11-26    07 : 52
- -
-
1264
2013-11-25    07 : 45
- -
-
1265
2013-11-21    08 : 00

PAT WORKING Area AIS Ayutthaya + Angthong
18.00
1266
2013-11-21    07 : 54
- -
-
1267
2013-11-20    07 : 42
- -
-
1268
2013-11-19    08 : 10
- -
-
1269
2013-11-18    07 : 41
- -
-
1270
2013-11-15    09 : 10

New Site Survey Before Working NikhornBang Pa In Area AYA
15.00
1271
2013-11-15    07 : 56
- -
-
1272
2013-11-14    07 : 57

Checking RedLine Before PAT Area Angthong > Suphanburi
18.00
1273
2013-11-14    07 : 55
- -
-
1274
2013-11-13    07 : 45
- -
-
1275
2013-11-12    08 : 00

Routing + New Site + Final BOQ Area AYA >ATG > SRI > SBR
16.00
1276
2013-11-12    07 : 15
- -
-
1277
2013-11-11    07 : 29
- -
-
1278
2013-11-08    07 : 53

Survey New Site Cable Working Area AIS Ayutthaya + Angthong
16.00
1279
2013-11-08    07 : 27
- -
-
1280
2013-11-07    07 : 49
- -
-
1281
2013-11-06    07 : 33

Submit Final BOQ After PAT+OSP Area AIS AYA>ATG >SBR >LBR
18.00
1282
2013-11-06    07 : 25
- -
-
1283
2013-11-05    07 : 47
- -
-
1284
2013-11-04    07 : 41
- -
-
1285
2013-11-01    07 : 41

PAT & FINAL BOQ Working Area Ayutthaya > Lopburi
18.00
1286
2013-11-01    07 : 38
- -
-
1287
2013-10-31    07 : 57
- -
-
1288
2013-10-30    08 : 51

Return Key Open Site After PAT AIS Ayutthaya OFFICE
12.00
1289
2013-10-30    07 : 58
- -
-
1290
2013-10-29    07 : 45

PAT Working & Final BOQ Area Angthong > Suphanburi
18.00
1291
2013-10-29    07 : 29
- -
-
1292
2013-10-28    07 : 53
- -
-
1293
2013-10-24    07 : 53
- -
-
1294
2013-10-22    08 : 03

CheckRedLine at Final BOQ 2+3g Area Angthong > Suphanburi
18.00
1295
2013-10-22    07 : 54
- -
-
1296
2013-10-21    07 : 48
- -
-
1297
2013-10-18    08 : 16

Outside Route Survey Working Area Ayutthaya
18.00
1298
2013-10-18    07 : 51
- -
-
1299
2013-10-17    07 : 59
- -
-
1300
2013-10-16    08 : 22
- -
-
1301
2013-10-15    09 : 31

Outside RedLine at Final BOQ Area Ayutthaya + Angthong
15.00
1302
2013-10-15    07 : 58
- -
-
1303
2013-10-14    07 : 49
- -
-
1304
2013-10-11    07 : 29

PAT ฿฿฿ Final BOQ work Area ฿฿ Ayutthaya > Angthong
18.00
1305
2013-10-11    07 : 21
- -
-
1306
2013-10-10    08 : 17
- -
-
1307
2013-10-09    08 : 03

Outside PAT & Final BOQ Zone :: Ayutthaya .> Saraburi
17.00
1308
2013-10-09    07 : 50
- -
-
1309
2013-10-08    07 : 49
- -
-
1310
2013-10-07    07 : 46
- -
-
1311
2013-10-04    07 : 52
- -
-
1312
2013-10-03    08 : 03

Outside RedLine at Final BOQ Zone :: Saraburi > Lopburi
18.00
1313
2013-10-03    07 : 47
- -
-
1314
2013-10-02    07 : 54
- -
-
1315
2013-10-01    08 : 16

Outside PAT&FinalBOQ Working Province Ayutthaya > Angthong
17.00
1316
2013-10-01    07 : 58
- -
-
1317
2013-09-30    07 : 50
- -
-
1318
2013-09-27    07 : 39

Outside PAT & Final BOQ Zone >> Ayutthaya > Suthanburi
18.00
1319
2013-09-27    07 : 36
- -
-
1320
2013-09-26    07 : 51
- -
-
1321
2013-09-25    08 : 00
- -
-
1322
2013-09-24    09 : 00

Outside Final BOQ Working Zone >> Angthong > Suthanburi
17.00
1323
2013-09-24    07 : 52
- -
-
1324
2013-09-23    07 : 49
- -
-
1325
2013-09-20    07 : 50

Outside PAT&FinalBOQ Working Zone >> Angthong > Suthanburi
No Return
1326
2013-09-20    07 : 29
- -
-
1327
2013-09-19    08 : 15
- -
-
1328
2013-09-18    07 : 51

Outside PAT&FinalBOQ Working Zone :: Ayutthaya .> Saraburi
18.00
1329
2013-09-18    07 : 21
- -
-
1330
2013-09-17    08 : 02
- -
-
1331
2013-09-16    08 : 02
- -
-
1332
2013-09-16    08 : 01
- -
-
1333
2013-09-13    08 : 11
- -
-
1334
2013-09-12    07 : 59
- -
-
1335
2013-09-11    08 : 10
- -
-
1336
2013-09-10    12 : 54

Outside @ Final BOQ Working Zone :: AIS Office Ayutthaya
17.00
1337
2013-09-10    08 : 13
- -
-
1338
2013-09-09    01 : 14

Outside @@ Final BOQ Working AIS Ayutthaya OFFICE
17.00
1339
2013-09-09    08 : 07
- -
-
1340
2013-09-06    10 : 17

Final BOQ Inspector Signature Zone :: Ayutthaya
14.00
1341
2013-09-06    08 : 02
- -
-
1342
2013-09-04    07 : 59
- -
-
1343
2013-09-03    07 : 31

Outside @@ Final PAT Working Zone @@@ Ayutthaya
15.00
1344
2013-09-03    07 : 30
- -
-
1345
2013-09-02    08 : 06
- -
-
1346
2013-08-30    07 : 37
- -
-
1347
2013-08-29    07 : 45

Outside " PAT 2g +3g" Before Zone >> Angthong > Suthanburi
17
1348
2013-08-29    07 : 45
- -
-
1349
2013-08-28    08 : 06
- -
-
1350
2013-08-27    11 : 35
- -
-
1351
2013-08-26    07 : 50
- -
-
1352
2013-08-23    07 : 28
- -
-
1353
2013-08-22    07 : 48

Outside Route Survey Design Province Ayutthaya .> Angthong
17.00
1354
2013-08-22    07 : 45
- -
-
1355
2013-08-21    08 : 59
- -
-
1356
2013-08-20    07 : 51

Outside Route Survey Design Zone * Ayutthaya & Angthong
17.00
1357
2013-08-20    07 : 43
- -
-
1358
2013-08-19    07 : 59
- -
-
1359
2013-08-16    08 : 08
- -
-
1360
2013-08-15    10 : 19

Outside " PAT 2g +3g" Working Zone Angthong > Suthanburi
18.00
1361
2013-08-15    07 : 59
- -
-
1362
2013-08-14    07 : 56

Outside Route Survey Design Province : Ayutthaya Area
16.00
1363
2013-08-14    07 : 28
- -
-
1364
2013-08-13    07 : 55
- -
-
1365
2013-08-09    07 : 23

Outside " PAT 2g +3g" Working Province Ayutthaya > Angthong
No Return
1366
2013-08-09    07 : 23
- -
-
1367
2013-08-08    08 : 27
- -
-
1368
2013-08-07    07 : 47
- -
-
1369
2013-08-06    08 : 51

Outside Route Survey Working Zone :: Ayutthaya
16.00
1370
2013-08-06    07 : 42
- -
-
1371
2013-08-05    07 : 39
- -
-
1372
2013-08-02    07 : 28

Outside " PAT 2g +3g" Working Zone :: Ayutthaya .> Angthong
No Return
1373
2013-08-02    07 : 20
- -
-
1374
2013-08-01    07 : 40

Outside Route Survey Working Province Ayutthaya .> Angthong
17.00
1375
2013-08-01    07 : 28
- -
-
1376
2013-07-31    07 : 40
- -
-
1377
2013-07-30    07 : 57
- -
-
1378
2013-07-29    08 : 00
- -
-
1379
2013-07-26    07 : 49

Outside Route Surver Working Province Angthong > Saraburi
17.00
1380
2013-07-26    07 : 36
- -
-
1381
2013-07-25    07 : 51
- -
-
1382
2013-07-24    07 : 46
- -
-
1383
2013-07-23    07 : 35
- -
-
1384
2013-07-19    07 : 21

Outside " PAT 2g +3g" Working Province Ayutthaya .> Angthong
18.00
1385
2013-07-19    07 : 20
- -
-
1386
2013-07-18    07 : 59
- -
-
1387
2013-07-17    07 : 32
- -
-
1388
2013-07-16    08 : 05
- -
-
1389
2013-07-15    07 : 55
- -
-
1390
2013-07-11    08 : 04
- -
-
1391
2013-07-10    08 : 58

Outside " PAT 2G " Working Province : Ayutthaya Area
18.00
1392
2013-07-10    08 : 25
- -
-
1393
2013-07-09    07 : 44

Outside " PAT Working " Province : Ayutthaya Area
18.00
1394
2013-07-09    07 : 20
- -
-
1395
2013-07-08    08 : 06
- -
-
1396
2013-07-05    08 : 20

Route Survey Zone Lopburi LOPBURI , SARABURI
17.00
1397
2013-07-05    07 : 39
- -
-
1398
2013-07-04    07 : 34
- -
-
1399
2013-07-03    07 : 54

Outside Route Survey Working Angthong>Singburi>Suthanburi
18.00
1400
2013-07-03    07 : 52
- -
-
1401
2013-07-02    07 : 39
- -
-
1402
2013-07-01    11 : 57

Outside Route Surver Working Zone Angthong > Suthanburi
16.00
1403
2013-07-01    07 : 50
- -
-
1404
2013-06-28    07 : 06
- -
-
1405
2013-06-27    07 : 40

Outside Route Surver Working Angthong>Singburi>Suthanburi
17.00
1406
2013-06-27    07 : 34
- -
-
1407
2013-06-26    07 : 18
- -
-
1408
2013-06-25    07 : 52
- -
-
1409
2013-06-24    08 : 13

Outside " PAT 2G " Working Province : Ayutthaya Area
18.00
1410
2013-06-24    07 : 39
- -
-
1411
2013-06-21    08 : 02
- -
-
1412
2013-06-20    07 : 56
- -
-
1413
2013-06-19    08 : 03
- -
-
1414
2013-06-18    07 : 54

Route Survey Zone Ayutthaya Ayutthaya
14.00
1415
2013-06-18    07 : 52
- -
-
1416
2013-06-17    07 : 36
- -
-
1417
2013-06-14    07 : 40
- -
-
1418
2013-06-13    08 : 09

Outside Route Surver Working Province : Ayutthaya Area
17.00
1419
2013-06-13    07 : 39
- -
-
1420
2013-06-12    08 : 09
- -
-
1421
2013-06-11    09 : 04

Outside Route Surver Working Province : Ayutthaya Area
16.00
1422
2013-06-11    08 : 15
- -
-
1423
2013-06-10    07 : 33
- -
-
1424
2013-06-07    07 : 41
- -
-
1425
2013-06-06    08 : 28

Outside " PAT 2g +3g" Working Province : Ayutthaya Area
No Return
1426
2013-06-06    07 : 21
- -
-
1427
2013-06-05    11 : 47

Outside " PAT 2g +3g" Working Province : Ayutthaya Area
18.00
1428
2013-06-05    07 : 29
- -
-
1429
2013-06-04    08 : 01

Outside " PAT Working " Rangsit > Ayutthaya Area
17.00
1430
2013-06-04    07 : 22
- -
-
1431
2013-06-03    07 : 34
- -
-
1432
2013-05-31    07 : 54
- -
-
1433
2013-05-30    08 : 01
- -
-
1434
2013-05-29    10 : 31

Outside " 3G " Working Province : LOPBURI Area
18.00
1435
2013-05-29    07 : 32
- -
-
1436
2013-05-28    08 : 00

Outside " PAT 2G " Working Province : Ayutthaya Area
17.00
1437
2013-05-28    07 : 35
- -
-
1438
2013-05-27    07 : 44
- -
-
1439
2013-05-23    08 : 08
- -
-
1440
2013-05-22    08 : 11

Outside Checking Route Surey Province Ayutthaya .> Saraburi
18.00
1441
2013-05-22    07 : 24
- -
-
1442
2013-05-21    08 : 12
- -
-
1443
2013-05-20    09 : 41

Outside SWAP Project Province AYUTTHAYA (NHT4-5)
13.00
1444
2013-05-20    08 : 17
- -
-
1445
2013-05-17    07 : 10

OutSide Route Survey 2G-54 Province Rangsit > Ayutthaya
18.00
1446
2013-05-17    07 : 07
- -
-
1447
2013-05-16    08 : 14
- -
-
1448
2013-05-15    07 : 47
- -
-
1449
2013-05-14    07 : 45
- -
-
1450
2013-05-13    07 : 34
- -
-
1451
2013-05-10    07 : 58
- -
-
1452
2013-05-03    07 : 28

Outside Inspection 3g BFKT Zone Chonburi > Rayong > CTB
No Return
1453
2013-05-03    07 : 17
- -
-
1454
2013-05-02    11 : 03

Side Inspection ( 2-3- 05-13 ) 2-5-13 CCS // 3-5-13 CBR+RYG
No Return
1455
2013-05-02    07 : 20
- -
-
1456
2013-04-29    05 : 07

Outside Inspection (30-04-13) Chonburi > Rayong >Chanthaburi
No Return
1457
2013-04-29    10 : 53

Side Inspection ( 29-30-04-13) ATG 29-4-13 // CBR>CTB 30-4-13
No Return
1458
2013-04-29    07 : 44
- -
-
1459
2013-04-26    08 : 38

Site Inspection true 3g bfkt Saraburi > Lopburi > Singbur
16.00
1460
2013-04-26    07 : 47
- -
-
1461
2013-04-25    10 : 44

Site Inspection true 3g bfkt Province Nakhonnayok
15.00
1462
2013-04-25    07 : 48
- -
-
1463
2013-04-23    11 : 07

Site Inspection ( 23-24Apr-13) 23-4-13 CCS>NKN # 24-3-13 ATG
No Return
1464
2013-04-23    07 : 28
- -
-
1465
2013-04-19    04 : 52

Inspection ( 22-23- Apr -13 ) > NKN > CCS > PCR > SKO
No Return
1466
2013-04-19    07 : 32
- -
-
1467
2013-04-18    07 : 42

Outside Inspection 3g BFKT Samutsakhon > Samutsongkhram
17.00
1468
2013-04-18    07 : 31
- -
-
1469
2013-04-12    07 : 40
- -
-
1470
2013-04-10    05 : 24

Outside Inspection (11-04-13) Angthong>Singburi>Suthanburi
18.00
1471
2013-04-10    08 : 09
- -
-
1472
2013-04-05    05 : 21

Site Inspection (09-Apr-2013) Province > CCS > NKN > PCR
18.00
1473
2013-04-05    05 : 21
- -
-
1474
2013-04-05    01 : 29

OutSite Inspection Nakhonnayok , Chachoengsao
No Return
1475
2013-04-05    08 : 25
- -
-
1476
2013-04-04    07 : 37
- -
-
1477
2013-04-02    02 : 24

Site Inspection ( 03-Apr-2013) Province Chanthaburi & Rayong
No Return
1478
2013-04-02    11 : 49
- -
-
1479
2013-04-01    05 : 29

Site Inspection ( 02-Apr-2013) Singburi>Saraburi>Nakhonnayok
18.30
1480
2013-04-01    07 : 40
- -
-
1481
2013-03-29    11 : 51

Site Inspection Chachoengsao , Prahinburi
No Return
1482
2013-03-29    07 : 40
- -
-
1483
2013-03-27    04 : 59

Site Inspection ( 28-Mar-2013) ProvincePrachinburi and Sakaeo
20.00
1484
2013-03-27    04 : 53

Site Inspection (Mar 28-03-13) Prachinburi and Sakaeo
20.00
1485
2013-03-27    07 : 38
- -
-
1486
2013-03-25    05 : 00

Next day I Inspection 26-3-13 Province Chonburi and Rayong
No Return
1487
2013-03-25    07 : 33
- -
-
1488
2013-03-22    07 : 30
- -
-
1489
2013-03-20    05 : 05

Tomorrow (21-03-13) Inspection Kanchanaburi > Suphanburi >ATG
No Return
1490
2013-03-20    07 : 24
- -
-
1491
2013-03-19    06 : 14

Internal Inspection true 3g bf Chachoengsao,Sakaeo,chonburi
No Return
1492
2013-03-19    06 : 10

Inspection true 3g bfkt Chachoengsao,Sakaeo
No Return
1493
2013-03-18    09 : 07
- -
-